flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Office developer offers prebuilt units

Office developer offers prebuilt units


August 11, 2010
This article first appeared in the 200910 issue of BD+C.

Metropole Realty Advisors, owner and developer of the newly renovated 681 Fifth Avenue office building in Manhattan's Plaza District, has created a 6,000-sf, full-floor prebuilt unit that functions as both a model unit and built space for tenants unwilling to incur the cost of a build out. Designed by MKDA Designs, the space features contemporary finishes, 14-foot ceilings, and warm, neutral tones. The eco-inspired unit consists of one large conference room, two open work areas, and six private offices partitioned by all-glass architectural wall systems.

Related Stories

Office Buildings | Oct 17, 2019

New social campus for innovators, tech leaders covers a full city block

Hollwich Kushner, with Gensler as design development architects, designed the building.

Office Buildings | Oct 15, 2019

New 80,000-sf coworking space completes in Chicago

It is the third ‘Spaces’ location in Chicago.

Office Buildings | Oct 8, 2019

David Chipperfield Architects to design new Rolex USA headquarters

The project will replace the existing building that has been occupied by Rolex since the 1970s.

Healthcare Facilities | Oct 1, 2019

Medical offices are filling space vacated by retail

Healthcare developers and providers like the locations, traffic, and parking these spaces offer.

Office Buildings | Sep 25, 2019

'Catalyst' will be Washington’s first CLT office building

Katerra is the design builder for the project with Michael Green Architecture as the design architect.

Office Buildings | Sep 6, 2019

New office complex in Southern California strives to create a Silicon Valley-like campus vibe

FLIGHT at Tustin Legacy includes 100,000 sf of amenities, and is laid out to tie into the surrounding city.

Office Buildings | Sep 3, 2019

A new HOK report focuses on designing offices for a neurodiverse workforce

Emphasizing inclusion and choice is a key component.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021