Many things—from a cup of coffee to tickets to a ballgame to a month’s rent—are expensive in New York City and San Francisco.
Add construction costs to the list. A report from the CBRE's Valuation & Advisory Services found that new office space core and shell construction costs are highest in the two coastal cities.
In New York, new office construction costs between $500 and $550 per sf, as of Q3 2015, the highest amount of the cities studied. San Francisco was second, with costs between $350 and $400 per sf.
Boston ($280 to $320 per sf), Seattle ($250-$300), Chicago ($240-$290), and Houston ($220-$270) finished the list.
“These numbers are for prices associated with the direct hard construction costs, and the ranges do not include acquisition costs or indirect soft costs,” said Robert Barone, of CBRE’s Valuation & Advisory Services, in a statement. “Indirect soft costs, which include costs for things such as architect/engineering fees, legal, administration, marketing, financing, FF&E and tenant improvements, can represent an additional 30% to 40% of the direct hard costs ranges.”
In addition, New York ($70.54 per sf, per annum, as of Q3) and San Francisco ($67.33) had the highest asking rents for offices, too.
Related Stories
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Nov 14, 2011
VanSumeren appointed to Traco general manager
VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco.
| Nov 11, 2011
By the Numbers
What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 11, 2011
AIA: Engineered Brick + Masonry for Commercial Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Nov 11, 2011
How Your Firm Can Win Federal + Military Projects
The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.
| Nov 10, 2011
BD+C's 28th Annual Reconstruction Awards
A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.
| Nov 10, 2011
Grousbeck Center for Students & Technology opens doors
New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.