Many things—from a cup of coffee to tickets to a ballgame to a month’s rent—are expensive in New York City and San Francisco.
Add construction costs to the list. A report from the CBRE's Valuation & Advisory Services found that new office space core and shell construction costs are highest in the two coastal cities.
In New York, new office construction costs between $500 and $550 per sf, as of Q3 2015, the highest amount of the cities studied. San Francisco was second, with costs between $350 and $400 per sf.
Boston ($280 to $320 per sf), Seattle ($250-$300), Chicago ($240-$290), and Houston ($220-$270) finished the list.
“These numbers are for prices associated with the direct hard construction costs, and the ranges do not include acquisition costs or indirect soft costs,” said Robert Barone, of CBRE’s Valuation & Advisory Services, in a statement. “Indirect soft costs, which include costs for things such as architect/engineering fees, legal, administration, marketing, financing, FF&E and tenant improvements, can represent an additional 30% to 40% of the direct hard costs ranges.”
In addition, New York ($70.54 per sf, per annum, as of Q3) and San Francisco ($67.33) had the highest asking rents for offices, too.
Related Stories
| Oct 2, 2012
Bernards working on project at L.A. White Memorial Medical Center
The new facility is a $15-million, 41,000-sf concrete structure which includes three stories of medical office space atop a three-level parking garage.
| Oct 1, 2012
Tyco completes separation process, now largest pure-play fire protection and security business
Tyco Integrated Security focused on delivering security solutions to commercial businesses.
| Sep 28, 2012
Seattle is home to first LEED-certified modular radiation center
By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.
| Sep 26, 2012
EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue
Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.
| Sep 24, 2012
Reed Construction completes Lafarge headquarters in Chicago
Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.
| Sep 24, 2012
Chicago Lakeside shortlisted for the Sustainia Award
The “Lakeside Idea” is about bridging a brownfield industrial past to a green lifestyle future, from steel mill to innovation mill.
| Sep 24, 2012
$3.8-million athletic field and track opens in Glen Head, N.Y.
The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.
| Sep 21, 2012
AAMA and WDMA release updated review and forecast that predicts industry trends
Significant volume is expected to return to the entry and interior door market as new construction demand is expected to grow at double-digit rates, outpacing remodeling and replacement activity as the housing market recovers.
| Sep 20, 2012
Mid-box retail study shows lack of available sites in Chicago
Existing supply is tight everywhere and almost non-existent in the most attractive zones.
| Sep 20, 2012
Forrester begins construction of freestanding cancer center in Montgomery County, Md.
The new 51,000-square-foot building will include two linear accelerator vaults for radiation equipment.