flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

An office building near DFW Airport is now home to two Alphabet companies

Office Buildings

An office building near DFW Airport is now home to two Alphabet companies

At 2999 Olympus, O’Brien Architects and Rogers-O’Brien Construction designed and built clients’ spaces to suit their needs.


By Novid Parsi, Contributing Editor | June 15, 2023
The 2999 Olympus office building near DFW Airport is now home to two Alphabet companies
All photos courtesy Rogers-O’Brien Construction

A five-minute drive from the Dallas-Fort Worth International Airport, the recently built 2999 Olympus is now home to two Alphabet companies: Verily, a life sciences business, and Wing, a drone delivery company. Verily and Wing occupy the top floor (32,000 sf and 4,000 sf, respectively) of the 10-story building, located in the lakeside, work-life-play development of Cypress Waters.

O’Brien Architects’ design of 2999 Olympus prioritizes tenant health and wellbeing with touchless entry, antimicrobial wraps on common area doors, a chilled water HVAC system, and air filtration systems in the elevators. Amenities include a coffee bar in the lobby and a fitness center with locker rooms and towel service. Employees also can access lakeside trails as well as outdoor parks and workspaces equipped with Wi-Fi. 

The building’s second and 10th floors provide balconies offering lake views. And its façade features precast panels with brick-inlays and a double-height canopy at the base.

Rogers-O’Brien Construction, which built 2999 Olympus, also completed the finish-out of three floors for clients Sahara Equity, Tamko, and Verily/Wing.

O’Brien Architects designed Verily’s space to include flexible workspaces, three client presentation rooms, and two fiber lines with one serving as backup. Security measures include card access and a lobby video camera that identifies each person. Verily’s space also features ceiling clouds made of felt, overhead wood beams, a café breakroom with booth seating, and a backlit LED wall with inset live moss.

On the Building Team:
Owner and developer: Billingsley Company
Design architect and architect of record: O’Brien Architects
MEP engineer (2999 Olympus): Blum Consulting Engineers, Inc.
MEP engineer (Verily): TD Industries and CESG
Structural engineer: Datum Engineers
Construction : Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

All photos courtesy Rogers-O’Brien Construction

 

Related Stories

Daylighting | Aug 18, 2022

Lisa Heschong on 'Thermal and Visual Delight in Architecture'

Lisa Heschong, FIES, discusses her books, "Thermal Delight in Architecture" and "Visual Delight in Architecture," with BD+C's Rob Cassidy. 

| Aug 17, 2022

IBM’s former office buildings in Boca Raton turn into a modern tech campus

Built in 1968, the Boca Raton Innovation Campus (BRiC), at 1.7 million square feet, is the largest office campus in Florida.

| Aug 9, 2022

Work-from-home trend could result in $500 billion of lost value in office real estate

Researchers find major changes in lease revenues, office occupancy, lease renewal rates.

Codes and Standards | Jul 22, 2022

Office developers aim for zero carbon without offsets

As companies reassess their office needs in the wake of the pandemic, a new arms race to deliver net zero carbon space without the need for offsets is taking place in London, according to a recent Bloomberg report.

Office Buildings | Jul 19, 2022

Austin adaptive reuse project transforms warehouse site into indoor-outdoor creative office building

Fifth and Tillery, an adaptive reuse project, has revitalized a post-industrial site in East Austin, Texas.

Office Buildings | Jul 12, 2022

Miami office tower nears completion, topping off at 55 stories

In Miami, construction of OKO Group and Cain International’s 830 Brickell office tower is nearing completion.

AEC Business Innovation | Jun 15, 2022

Cognitive health takes center stage in the AEC industry

Two prominent architecture firms are looking to build on the industry’s knowledge base on design’s impact on building occupant health and performance with new research efforts.

Sustainable Design and Construction | Jun 14, 2022

For its new office, a farm in California considers four sustainable design options, driven by data

The architect used cove.tool’s performance measurement software to make its case.

Office Buildings | Jun 13, 2022

San Antonio’s electric utility HQ to transform into a modern office building

In San Antonio, Tex., the former headquarters of CPS Energy, the city’s electric utility, is slated to transform into 100,000 square feet of office and retail space on San Antonio’s famed River Walk.

Office Buildings | Jun 8, 2022

Former L.A. Times newsroom/printing plant remade into office campus

Phase 1 of The Press, an adaptive reuse project that is converting an old Los Angeles Times facility into a modern office campus, was recently completed in Costa Mesa, Calif.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021