flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ODA completes West Half, its first D.C. project

Multifamily Housing

ODA completes West Half, its first D.C. project

The project is located in Washington, D.C.’s Navy Yard.


By David Malone, Managing Editor | August 27, 2021
West Half exterior

Photo: Scott Frances

ODA has completed a new multifamily structure in Washington, D.C.’s Navy Yard that comprises 465 apartments in a single square block. The project’s cascading facade creates a connection at the street level to provide the building with a transparent, approachable feel.

Dubbed West Half, the 10-story residential building includes unique apartment layouts that break the typical D.C. building mass into a more human scale that connects the indoors and outdoors and increases the amount of light and air. The floors are stacked on an inward trajectory that allows for ample outdoor terraces on the facade and an inner courtyard filled with cantilevered apartments.

 

West Half facadePhoto: Scott Frances.

 

A private rooftop lounge, designed by Venus Williams, provides views of Nationals Park. Terraces on the penthouse also provide direct sight lines to the ballpark. Because the project is highly visible from the stadium, the goal was to encourage richer, deeper, and more unified experiences for residents, tourists, and stadium-goers alike.

 

West Half bedroom from a terracePhoto: Scott Frances.

 

West Half’s interiors are defined by gently angled elements, minimalistic details, and a few tectonic finishes. The building’s indoor-outdoor connection is bolstered by interior elements such as the large indoor gym, which is exposed to the elements through an adjacent inner courtyard and the landscaped rooftop pool and resident lounge.

Sustainable strategies include cisterns that harvest water for the building’s irrigation and extensive green roofs that occupy 50% of the total roof area. The building has been LEED Gold certified. JBG Smith developed the project.

 

Nationals Park from West HalfPhoto: Pavel Bendov.

 

West Half pool deckPhoto: Scott Frances.

Related Stories

Multifamily Housing | Feb 22, 2018

Multifamily building with 25,000 sf of amenities rises on the shore of the Potomac River

The building is part of the National Gateway mixed-use development at Potomac yard.

Multifamily Housing | Feb 15, 2018

United States ranks fourth for renter growth

Renters are on the rise in 21 of the 30 countries examined in RentCafé’s recent study.

Multifamily Housing | Jan 31, 2018

4 ways multifamily developers can attract Baby Boomer, Millennial buyers

As Baby Boomers downsize and Millennials begin buying homes, multifamily developments in dynamic urban areas are meeting the demand.

Sports and Recreational Facilities | Jan 25, 2018

Virginia Beach: A surf town with a wave problem no more

A world-class surf park will highlight Virginia Beach’s new live-work-play development.

Market Data | Jan 25, 2018

Renters are the majority in 42 U.S. cities

Over the past 10 years, the number of renters has increased by 23 million.

Resiliency | Jan 24, 2018

A luxury community in Florida mandates resilience in new-home construction

Alys Beach’s in-house GC builds to standards set by the FORTIFIED program.

Multifamily Housing | Jan 24, 2018

Apartment rent rates jump 2.5% in 2017, led by small and mid-sized markets

The average price for one-bedroom units increased the most.

Multifamily Housing | Jan 17, 2018

The Concours at Carlisle: A condo community for gearheads

The new development will represent the only auto condo community in Central Pennsylvania.

Mixed-Use | Jan 16, 2018

Mixed-use development under construction in Detroit’s central business district

The development is being built on the former site of the Statler Hotel.

Multifamily Housing | Jan 10, 2018

Multifamily 2018 outlook: Developers tap the brakes, but will maintain historic pace

Multifamily developers are poised to register the second-highest annual completions count of this cycle in 2018, but with fewer completions than 2017’s cycle peak, according to a CBRE report.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021