flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ODA completes West Half, its first D.C. project

Multifamily Housing

ODA completes West Half, its first D.C. project

The project is located in Washington, D.C.’s Navy Yard.


By David Malone, Managing Editor | August 27, 2021
West Half exterior

Photo: Scott Frances

ODA has completed a new multifamily structure in Washington, D.C.’s Navy Yard that comprises 465 apartments in a single square block. The project’s cascading facade creates a connection at the street level to provide the building with a transparent, approachable feel.

Dubbed West Half, the 10-story residential building includes unique apartment layouts that break the typical D.C. building mass into a more human scale that connects the indoors and outdoors and increases the amount of light and air. The floors are stacked on an inward trajectory that allows for ample outdoor terraces on the facade and an inner courtyard filled with cantilevered apartments.

 

West Half facadePhoto: Scott Frances.

 

A private rooftop lounge, designed by Venus Williams, provides views of Nationals Park. Terraces on the penthouse also provide direct sight lines to the ballpark. Because the project is highly visible from the stadium, the goal was to encourage richer, deeper, and more unified experiences for residents, tourists, and stadium-goers alike.

 

West Half bedroom from a terracePhoto: Scott Frances.

 

West Half’s interiors are defined by gently angled elements, minimalistic details, and a few tectonic finishes. The building’s indoor-outdoor connection is bolstered by interior elements such as the large indoor gym, which is exposed to the elements through an adjacent inner courtyard and the landscaped rooftop pool and resident lounge.

Sustainable strategies include cisterns that harvest water for the building’s irrigation and extensive green roofs that occupy 50% of the total roof area. The building has been LEED Gold certified. JBG Smith developed the project.

 

Nationals Park from West HalfPhoto: Pavel Bendov.

 

West Half pool deckPhoto: Scott Frances.

Related Stories

Sponsored | Multifamily Housing | Nov 24, 2021

MagicPak HVAC System: More Desirable Living, Dramatically Less Time

When tapped to create a modern 280-unit residence in downtown Philadelphia, modular builder Volumetric Building Companies used the MagicPak All-in-One™ HVAC system to optimize square footage, expand rooftop amenities, improve the exterior aesthetics and simplify ongoing maintenance – all with 60 percent less onsite HVAC install time than a traditional split system. 

Giants 400 | Nov 18, 2021

2021 Multifamily Sector Giants: Top architecture, engineering, and construction firms in the U.S. multifamily building sector

Clark Group, Humphreys and Partners, and Kimley-Horn head BD+C's rankings of the nation's largest multifamily building sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

Sponsored | | Nov 15, 2021

How TDK Construction Saves Time and Money with EXACOR™ MgO Panels: Getting in on the Ground Level

Smart decisions made at the start of multifamily design-builds can improve efficiency on the job site, keeping projects on-time and on-budget, so you can make your properties profitable sooner. TDK Construction did just that on a recent luxury apartment project in Tennessee.

Multifamily Housing | Nov 14, 2021

How to build better parking for multifamily housing projects

In designing and building multifamily projects, parking determines everything from site suitability to the building’s footprint to revenue optimization.

Multifamily Housing | Nov 9, 2021

MAD Architects unveils One River North design

The project is set to rise in Denver.

Hotel Facilities | Nov 3, 2021

California’s Hotel del Coronado is finishing up the final piece to its Master Plan

A 75-residence Shore House will be family oriented and meeting commodious.

Multifamily Housing | Nov 3, 2021

Courthouse becomes mixed-income housing development

The project is located in Worcester, Mass.

Adaptive Reuse | Nov 1, 2021

CallisonRTKL explores converting decommissioned cruise ships for housing

The rapid increase in cruise ship decommissioning during the last 18 months has created a unique opportunity to innovate and adapt these large ships.

Multifamily Housing | Oct 31, 2021

Developer chooses ductless HVAC system for the Lofts at Empire Yards

Georgia developer chooses ductless systems for their performance, quiet operation, and efficiency 'in a nice, sleek package.'

Multifamily Housing | Oct 31, 2021

Propane tankless water heaters conserve water and energy

Propane tankless water heaters offer efficient, on-demand hot water for multifamily buildings.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021