O’Connell Robertson, a full service architecture, engineering and interior design firm, acquired the Mitchell Design Consultancy of San Antonio. MDC has had a strong focus on retail facility design, branded environments and commercial buildings. Mary Ann A. Mitchell, AIA, IIDA, MDC principal and founder, joins O’Connell Robertson as part of the acquisition.
Mitchell’s 25-year career as an architect and interior designer in San Antonio has included facility design and project management for Methodist Healthcare System, Baptist Hospital, UT Health Science Center, and Alamo Colleges. She most recently provided program management and design review services for the new 1 million SF Fort Hood replacement hospital in Killeen.
She also spent 12 years at H-E-B Corporation during which time she served as the Director of Design – Architecture and Format Development. Mitchell’s smart, knowledge-based design solutions have resulted in meaningful and authentic branded environments, pilot concepts, and prototype designs for clients. She is continuously focused on delivering extraordinary experiences that leave a positive impact on the lives of everyone who experiences and interacts with her work. In her role as Principal, Mitchell will serve as O’Connell Robertson’s Healthcare and Government Market Leader for the South Texas Region. +
Related Stories
| Feb 28, 2012
Roofing contractors recognized for workmanship
Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 27, 2012
Consigli complete first building for Bigelow Ocean Sciences Campus
Designed by WBRC Architects Engineers in association with Perkins + Will.
| Feb 27, 2012
Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.
Intricate interior project involved construction of more than 80 offices.
| Feb 27, 2012
Research Institute at Texas Children’s Hospital building receives LEED Gold
Innovative and sustainable design reflects best environmental building practices.