flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Occupant egress simulations that impact codes fall short, researchers say

Codes and Standards

Occupant egress simulations that impact codes fall short, researchers say

Building evacuations in emergencies are too dangerous as a result.


By Peter Fabris, Contributing Editor | March 28, 2016
Occupant egress simulations that impact codes fall short, researchers say

Photo: Jeff Montgomery/Creative Commons.

Simulations of mass evacuations of buildings are inadequate, according to two European researchers, and resulting designs put occupants at risk.

Modern safety engineering aims to make it so occupants can exit a structure during a fire or other disaster before it collapses. But variables complicate egress simulations that influence codes and designs. “It depends on the building and the escape routes, but crucially also on how people behave,” the researchers write.

“The problem is that the simulations aren't good enough – that's what we have learned from detailed behavioral studies based on recent fires and terrorist attacks including 9/11 and the Mont Blanc tunnel fire of 1999 in which 41 people died,” they say.

Evacuees decide whether and when to start moving, in which direction, whether to respond to other evacuees, and which exit to use. “Each choice also depends on how various factors interact with one another. Is the decision maker bold or risk-averse? Is there smoke in the room? How far away are the exits? And of most interest for our research purposes, what are the other evacuees doing?”

“Herding” behavior, when large groups follow the crowd, is typically discouraged in designs; but safer alternatives may derive from understanding and possibly exploiting this tendency.

Related Stories

Codes and Standards | Apr 18, 2016

Efficiency finance pilot project to spur retrofits on existing buildings

EDF and PG&E team up on interest-free loans for qualified projects.  

Codes and Standards | Apr 18, 2016

ASHRAE releases proposed energy standard for historic buildings

Designed to balance with preservation requirements.  

Codes and Standards | Apr 13, 2016

Canadian city fines itself for failing to get a building permit for building renovation

Guelph, Ontario, will pay a $1,125 fine to the province.

Codes and Standards | Apr 12, 2016

Construction trade groups sue OSHA over silica rule

Cite concerns about technological and economic feasibility.

Wood | Apr 8, 2016

New LEED Pilot ACP designed to help eliminate irresponsibly sourced materials

Illegal wood is primary target to restrict illicit material in the supply chain.  

Lighting | Apr 5, 2016

Lighting requirements for high-rise dwellings proposed for energy standard

The requirements would effectively eliminate incandescent and halogen bulbs.

Steel Buildings | Apr 4, 2016

AISI publishes Cold-Formed Steel Framing Design Guide, 2016 Edition

Updates 2007 edition; includes five comprehensive design examples.  

Data Centers | Apr 1, 2016

ASHRAE releases publication on the impact of IT equipment on data center design

The book offers advice for designing structures in the fast-changing data center industry.

School Construction | Mar 28, 2016

National report on school buildings reports $46 billion annual funding shortfall

Millions of students said to be learning in obsolete facilities.  

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021