flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Obsolete safety standards may have been used in cleanup of former naval shipyard

Codes and Standards

Obsolete safety standards may have been used in cleanup of former naval shipyard

San Francisco redevelopment site work may have been racked by fraud.


By Peter Fabris, Contributing Editor | November 14, 2018

The cleanup of the former Hunters Point Naval Shipyard, a large site slated for a major redevelopment project in San Francisco, has been rocked by scandal, according to a report by the San Francisco Chronicle.

The project has allegedly been plagued by faked soil samples, falsified documents, two criminal convictions, and three federal lawsuits. The Navy’s effort to remove radioactive contamination from the site has relied on “decades-old, obsolete safety standards in order to avoid cleaning up dangerous substances,” the Chronicle reported.

That strategy lowers the Navy’s costs, but would increase the risk of people living or working on the site getting cancer. The500-acre Superfund site is one of the most contaminated places in the country.

A scientist working for a private watchdog group said that no one knows what is actually in the ground, even after decades of study and cleanup work.

Related Stories

Codes and Standards | Jan 5, 2017

2018 building energy code upholds efficiency gains

Efforts to scale back efficiency requirements largely defeated.

Codes and Standards | Jan 4, 2017

Low-income housing doesn’t lower neighborhood housing values

A Trulia study contradicts longstanding fears.

Codes and Standards | Jan 3, 2017

Intelligent transportation systems have implications for designers, construction firms

Sensors and Internet of Things devices will have to be embedded in infrastructure.

Codes and Standards | Dec 15, 2016

OSHA releases safety recommendation guide for construction industry

It is said to be most helpful to small and mid-sized contractors.

Codes and Standards | Dec 14, 2016

Cities must invest $375 billion to avoid catastrophic global climate change

C40 Cities Climate Leadership Group advocates low carbon infrastructure.

Codes and Standards | Dec 14, 2016

Resilient construction techniques pay for themselves over lifetime of buildings

Spending $340,000 for resiliency would pay for itself over the lifetime of a $10 million structure.

Codes and Standards | Dec 12, 2016

Dept. of Energy launches program to advance zero energy school design

Six school districts and two states are among the first to mainstream zero energy schools.

Codes and Standards | Dec 9, 2016

California city’s plan for net zero building includes net zero water usage

Santa Monica city services building aims for highest level of sustainability.

Codes and Standards | Dec 8, 2016

WELL and BREEAM to align standards

The goal is to make it easier for projects pursuing both standards.

Codes and Standards | Dec 7, 2016

U.S. lumber industry pushes for import duties on Canadian softwood

The industry claims the product is being sold below fair market value.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021