flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Obama issues executive order for 40% reduction in federal government’s greenhouse gas emissions

Government Buildings

Obama issues executive order for 40% reduction in federal government’s greenhouse gas emissions

Action also aims to increase government’s renewable energy use


By Peter Fabris, Contributing Editor | March 28, 2015
Obama issues executive order for 40% reduction in federal government’s greenhouse gas emissions

IRS headquarters building. Photo: IRS

President Obama signed an executive order calling for the federal government to cut its greenhouse gas emissions 40% from 2008 levels over the next decade.

The action also calls for an increase in the share of renewable energy in the federal government’s electricity supply to 30% during that same period. In step with the President’s action, federal suppliers including Honeywell, IBM, General Electric, and other major U.S. firms are pledging to reduce their own carbon footprint by 5 million metric tons over the next 10 years compared with 2008 levels.

The cumulative results of these actions would cut overall U.S. emissions by 26 million tons by 2025, the equivalent of taking nearly 5.5 million cars off the roads. A White House adviser estimated that the new measures will save $18 billion. He said that the federal government has already cut its overall emissions 17% since Obama took office, saving $1.8 billion.

Some of Obama’s environmental goals are lagging, though. The 2007 Energy Independence and Security Act dictated all new federal buildings and those undergoing major renovations had to use fossil-fuel free energy by 2030. The Energy Department has been slow to implement the rule, however, and a bipartisan coalition in the Senate is seeking to roll it back.

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 9, 2012

Shepley Bulfinch given IIDA Design award for Woodruff Library?

The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.

| May 7, 2012

2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital

How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.

| May 3, 2012

Howard S. Turner 1911–2012

A founding member of the Turner Construction Co.

| May 2, 2012

Public housing can incorporate sustainable design

Sustainable design achievable without having to add significant cost; owner and residents reap benefits

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 24, 2012

AECOM design and engineering team realizes NASA vision for Sustainability Base

LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021