flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Oakland schools’ central kitchen cooks up lessons along with 30,000 meals daily

Education Facilities

Oakland schools’ central kitchen cooks up lessons along with 30,000 meals daily

The facility prepares meals daily and provides culinary arts and agriculture instruction.


By Peter Fabris, Contributing Editor | November 9, 2023
Unified School District Central Kitchen, Instructional Farm, and Education Center TheCenter_PhotoBruceDamonte
Photo: Bruce Damonte

CAW Architects recently completed a facility for the Oakland, Calif., school district that feeds students and teaches them how to grow, harvest, and cook produce grown onsite. The production kitchen at the Unified School District Central Kitchen, Instructional Farm, and Education Center (“The Center”) prepares and distributes about 30,000 meals a day for district schools lacking their own kitchens.

The site also provides training for school district cafeteria workers and educational programs for students to learn about culinary arts, science, health, wellness, and agriculture. A greenhouse and demonstration garden illustrate growing cycles and how to identify different types of produce. The greenhouse produces starter plants from seed to supply about 60 school gardens. Culinary instruction takes place in a classroom outfitted with a full-service demonstration and teaching kitchen, and in an outdoor kitchen equipped with a pizza oven.

A courtyard serves as the facility’s central hub, connecting the production kitchen, indoor classrooms, and outdoor classrooms. Large glass roll-up doors open the indoors to the courtyard. An expansive wood trellis shades the courtyard and reduces glare in classrooms.

The building’s energy efficiency gets a boost from a hot water system that uses captured waste heat from a highly efficient C02 closed-loop refrigeration system. A solar-ready roof has space to support solar panels that will supply half of the production kitchen’s electric power.

The next phase of the project will use an undeveloped portion of the site to create an urban farm, community garden, and nature play space. The farm will offer career training for high school students and adult education programs.

Owner and/or developer: Oakland (Calif.) Unified School District
Design architect: CAW Architects
Architect of record: CAW Architects
MEP engineer: Integral Group
Structural engineer: SOHA Engineers
Construction manager: Cumming Group

Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Unified School District Central Kitchen, Instructional Farm, and Education Center by CAW Architects
Photo: Bruce Damonte
Photo: Bruce Damonte
Photo: Bruce Damonte
Photo: Bruce Damonte
Photo: Bruce Damonte
Photo: Bruce Damonte
Photo: Bruce Damonte

 

 

Related Stories

| Jan 9, 2014

Special report: Can design prevent another Sandy Hook?

Our experts say no, but it could save lives. In this report, they offer recommendations on security design you can bring to your K-12 clients to prevent, or at least mitigate, a Sandy Hook on their turf.

Smart Buildings | Jan 7, 2014

9 mega redevelopments poised to transform the urban landscape

Slowed by the recession—and often by protracted negotiations—some big redevelopment plans are now moving ahead. Here’s a sampling of nine major mixed-use projects throughout the country. 

| Dec 27, 2013

$1 billion 'city within a city' development approved by Coachella, Calif., city council

The mega development includes 7,800 homes, a retail center, office space, and nearly 350 acres of open space.

| Dec 17, 2013

Nation's largest net-zero K-12 school among winners of 2013 Best of Green Schools award

The Lady Bird Johnson Middle School in Irving, Texas, was named a winner of USGBC's annual award, along with nine other schools, individuals and communities working toward the common goal of healthy, high-performing learning places.

| Dec 16, 2013

Irving, Texas building state’s second net-zero school

Lee Elementary School, scheduled to open in fall 2014, will be net-zero-ready, and if the school board decides to sell district bonds and allow the purchase of additional solar panels, will be a true net-zero facility.

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Dec 9, 2013

Tips for designing higher education's newest building type: the learning commons

In this era of scaled-down budgets, maximized efficiencies, new learning methods and social media’s domination of face time, college and university campuses are gravitating toward a new space type: the learning commons.

| Dec 5, 2013

Exclusive BD+C survey shows reaction to Sandy Hook tragedy

More than 60% of AEC professionals surveyed by BD+C said their firms experienced heightened interest in security measures from school districts they worked with. 

| Nov 27, 2013

Exclusive survey: Revenues increased at nearly half of AEC firms in 2013

Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021