flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

N|V|5 Global bolsters its MEP business with acquisition of RDK Engineers

Engineers

N|V|5 Global bolsters its MEP business with acquisition of RDK Engineers

This is its fifth deal so far this year.


By John Caulfield, Senior Editor | June 9, 2017

N|V|5 Global provided commissioning services on the Pentagon throughout its renovation. Image: Courtesy of N|V|5 Global

Since it was founded in 2010, N|V|5 Global, a publicly owned international engineering services provider based in Hollywood Fla., has acquired 25 companies, five of them in 2017 alone, including, most recently, Boston-based Richard D. Kimble Co., Inc. (RDK Engineers), a 120-year-old MEP engineering and design firm with 185 employees working out of five East Coast offices.

Speaking by phone from the Red Rock Resort in the Summerlin, Nev., master planned community, where N|V|5 Global was holding its annual shareholders meeting, Dickerson Wright, its Chairman and CEO, told BD+C that the addition of RDK Engineers “opens up the Northeast for us,” and strengthens N|V|5’s MEP practice.

Aside from the RDK deal, N|V|5’s acquisitions this year have included H&K, a $6 million geotechnical engineering firm in Northern California; Lochrane, a $6.5 million civil engineering firm in Orlando, Fla.; and Energenz, a $2 million international energy services company based in Irvine, Calif. Last October, NV5 bought JBA Consulting Engineers.

In its first quarter ended April 1, N|V|5’s revenue increased by 42.7% to $64.1 million, and net income grew by 10.4% to $2.27 million.

 

 

N|V|5 Global has been growing through acquisition since it launched eight years ago. It places a premium on keeping the employees of the companies it purchases in place, and making sure the acquisition is adding value to the firm. Image: N|V|5 Global

 

N|V|5 paid for its acquisition of RDK Engineers with a combination of cash and stock. Wright said that it’s typical for his company to pay 50% of a deal’s value in cash.

N|V|5 focuses on construction quality assurance, infrastructure, engineering and support services, energy, program management, and environmental solutions. Over the years, the firm has developed a process to determine whether another business would be a good fit through acquisition. Its criteria, explained Wright, revolve around added value, scalability, IT synchronicity, and single branding.

Perhaps most important, a business’s management has to be completely on board with the merger. Wright pointed out that there are 145,000 engineering firms in North America alone, most of which are private companies. This fragmentation has turned the engineering sector into a revolving door that has eroded any sense of loyalty and continuity between employer and employee.

As part of its acquisition strategy, N|V|R uses a carrot and stick approach to keep valued employees from walking out the door: It gets the managements of the companies it buys to sign employee agreements, in exchange for restricted NV5 stock they would receive after four years of service. Twenty-three of RDK’s managers signed that agreement.

“I am a big believer in partners and a big believer in shareholders; that’s why we’re public,” said Wright.

Christopher Cummings, PE, LEED AP, RDK’s CEO, said he believed that N|V|5 shared RDK’s “priority of providing innovative solutions to our clients through practical ingenuity, efficiency, and quality engineering in every project.”

Wright observed that a lot of mergers and acquisitions fail because too many companies get caught up in completing the deal without thinking through possible cultural collisions. “You’re crossing an emotional bridge [when two companies merge] and often times people aren’t listening to things that end up being problems,” such as allowing the acquired company to operate with the same autonomy or brand it had as an independent.

N|V|5, which has 2,300 employees and 102 offices, continues to look for companies that could be strategic fits. Wright said he sees “phenomenal opportunities” in Texas (where N|V|5 already has offices in Dallas and Austin). “But I don’t want to go in on a company without a solid foundation.”

He said his firm “loves” water-related projects, although he acknowledges that acquisition costs in that sector are high. N|V|5 is also interested in getting deeper into environmental projects, even though they have “a high barrier of entry,” said Wright.

N|V|5 operates four offices in Asia. But international expansion is less likely. “Only if our clients bring us there,” said Wright. For example, it just completed a liquefied natural gas processing plant in Angola for Bechtel Energy, for which N|V|5 provided quality control and energy services. 

 

 

N|V|5 Global has provided MEP engineering services for a number of MGM-owned properties, including MGM Cotai in Macau. N|V|5's chairman, Dick Wright, said his company's international growth will be client driven. Image: N|V|5 Global

 

Tags

Related Stories

| Sep 4, 2013

Augmented reality: 12 applications for design and construction professionals

Building Design+Construction reached out to AEC professionals who have studied and applied augmented reality and asked them to pinpoint applications that are ripe for the technology. Here’s what they had to offer.

| Sep 4, 2013

Augmented reality goes mainstream: 12 applications for design and construction firms

Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site. 

| Sep 4, 2013

K-12 school design that pays off for students

More and more educators are being influenced by the Reggio Emilia approach to pedagogy, with its mantra of “environment as the third teacher”—an approach that gives Building Teams a responsibility to pay even closer attention to the special needs of today’s schools.

| Sep 4, 2013

Video: Autodesk Fellow Tom Wujec on why you should join the Vision U40 competition

Tom Wujec, lead facilitator of BD+C's 3rd Annual Under 40 Leadership Summit, October 9-11 in San Francisco, explains the Vision U40 competition, which will launch at the event. U40 Summit participants will collaborate in small teams to develop innovative solutions to today's pressing social, economic, technical and cultural problems related to the built environment. They will complete for $5,000 in prizes.

| Sep 4, 2013

Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show

Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program. 

| Sep 4, 2013

Twenty-nine-acre brick building complex in Watertown, Mass., to be renovated as innovation hub

The owner of a 29-acre cluster of brick buildings in Watertown, Mass., wants to reinvent the site as a 21st-century innovation hub.

| Sep 4, 2013

Last chance to pre-register for BUILDINGChicago/Greening the Heartland Conference at 20% savings

Attendees of the BUILDINGChicago/Greening the Heartland Expo and Conference can still save 20% off the at-site registration fee by registering online in these final days before the event opens on September 9 and concludes on September 11.

| Sep 3, 2013

'School in a box' project will place school in San Diego public library

Thinking outside the box, LPA Inc. is designing a school inside a box. With an emphasis on three E’s—Engage, Educate, and Empower—e3 Civic High is now being constructed on the sixth and seventh floors of a public library in downtown San Diego. Library patrons will be able to see into the school via glass elevators, but will not have physical access to the school.

| Sep 3, 2013

Delinquency rate for commercial real estate loans at lowest level in three years

The delinquency rate for US commercial real estate loans in CMBS dropped for the third straight month to 8.38%. This represents a 10-basis-point drop since July's reading and a 175-basis-point improvement from a year ago. 

| Sep 3, 2013

Grand Junction, Colo., courthouse aims to be first net-zero building on National Register of Historic Places

After a two year renovation, the 95-year oldWayne S. Aspinall Federal Building and Courthouse in Grand Junction, Colo., is being evaluated for LEED Platinum status and may become the National Register of Historic Places’ first net-zero-energy building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021