flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

By the Numbers

By the Numbers

66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs. 


By By Tim Gregorski, Senior Editor | March 2, 2012
1,000 - Approximate number of questions in the Modern Architecture game by NEXT
1,000 - Approximate number of questions in the Modern Architecture game by NEXT Architects, Amsterdam. The goal is simple: reach
This article first appeared in the March 2012 issue of BD+C.

66
The total number of skyscrapers China is expected to add in the next six years, DOUBLING ITS COLLECTION FROM 75 TO 141. India, the world’s second most populous nation, currently has two skyscrapers but will ADD 14 MORE IN THE NEXT FIVE YEARS.

1.4 billion
An Irish artist built an apartment made of bricks that include the SHREDDED REMAINS OF €1.4 BILLION he borrowed from Ireland’s national mint. Frank Buckley built the apartment in the lobby of a Dublin office building, which has remained vacant since its completion four years ago. “People were pouring billions into buildings now worth nothing,” says Buckley. “I WANTED TO CREATE SOMETHING FROM NOTHING.”

3,654
In feet, the proposed height of a NEW BUSINESS TOWER ON THE KHAZAR ISLANDS, a chain of 41 artificial islands in the Caspian Sea that also will include hotels and apartment buildings. The tower would be 27% TALLER than the current skyscraper champ, the BURJ KHALIFA IN DUBAI. Construction on the islands is set to begin at the end of 2013.

21,000
Number of NEW CONSTRUCTION JOBS created in January 2012, according to the Labor Department.

12
In years, the PEAK-TO-PEAK RECOVERY period for the cement industry. BY 2017, CEMENT CONSUMPTION IS EXPECTED TO REACH LEVELS LAST RECORDED IN 2005, according to the Portland Cement Association. A number of factors, including a reduction in office vacancy rates and high unemployment, contribute to the lengthy recovery period. 

5
Total number of TEMPORARY LOADING BAYS being constructed at ONE WORLD TRADE CENTER. The Port Authority of New York and New Jersey revealed that the loading dock under the trade center will not be accessible for tenants to move their equipment into the 104-story tower when it opens. A TEMPORARY TRAIN STATION for the Port Authority is blocking access to the underground loading area.

0
Amount being charged by FRANK GEHRY for his work on the Culver City, Calif., home for the Jazz Bakery. Plans call for a two-story building with the main 250-seat concert room upstairs and a small black-box theater on the ground floor. THE FOOTPRINT OF THE BUILDING MEASURES ONE-SEVENTH OF AN ACRE.

1.3
In trillions, the GLOBAL REVENUE predicted from the CONSTRUCTION OF ZERO-ENERGY BUILDINGS over the next 23 years. The figure will reach almost $690 MILLION BY 2020 and $1.3 TRILLION BY 2035, according to a report published by Pike Research.

2,000
Total number of PV panels to be installed on the FIRST NET-ZERO SCHOOL in the northeast U.S. Located in the Rossville neighborhood in Staten Island, N.Y., PS 62 is slated to cost between $55-58 million, and will open in September 2015.

35
Current percentage of CONTRACTORS THAT ARE CURRENTLY USING BIM, up 8% from 2011, according the 2012 Construction Industry Hiring and Business Outlook conducted by the Associated General Contractors. 47% of survey respondents expect BIM usage to increase in 2012, depending on the market segment. +

Related Stories

| Dec 17, 2010

ARRA-funded Navy hospital aims for LEED Gold

The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.

| Dec 17, 2010

Arizona outpatient cancer center to light a ‘lantern of hope’

Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.

| Dec 17, 2010

Cladding Do’s and Don’ts

A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.

| Dec 17, 2010

5 Tips on Building with SIPs

Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.

| Dec 17, 2010

How to Win More University Projects

University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.

| Dec 13, 2010

Energy efficiency No. 1 priority for commercial office tenants

Green building initiatives are a key influencer when tenants decide to sign a commercial real estate lease, according to a survey by GE Capital Real Estate. The survey, which was conducted over the past year and included more than 2,220 office tenants in the U.S., Canada, France, Germany, Sweden, the UK, Spain, and Japan, shows that energy efficiency remains the No. 1 priority in most countries. Also ranking near the top: waste reduction programs and indoor air.

| Dec 7, 2010

Are green building RFPs more important than contracts?

The Request for Proposal (RFP) process is key to managing a successful LEED project, according to Green Building Law Update. While most people think a contract is the key element to a successful construction project, successfully managing a LEED project requires a clear RFP that addresses many of the problems that can lead to litigation.

| Dec 7, 2010

Blue is the future of green design

Blue design creates places that are not just neutral, but actually add back to the world and is the future of sustainable design and architecture, according to an interview with Paul Eagle, managing director of Perkins+Will, New York; and Janice Barnes, principal at the firm and global discipline leader for planning and strategies.

| Dec 7, 2010

Green building thrives in shaky economy

Green building’s momentum hasn’t been stopped by the economic recession and will keep speeding through the recovery, while at the same time building owners are looking to go green more for economic reasons than environmental ones. Green building has grown 50% in the past two years; total construction starts have shrunk 26% over the same time period, according to “Green Outlook 2011” report. The green-building sector is expected to nearly triple by 2015, representing as much as $145 billion in new construction activity.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021