66
The total number of skyscrapers China is expected to add in the next six years, DOUBLING ITS COLLECTION FROM 75 TO 141. India, the world’s second most populous nation, currently has two skyscrapers but will ADD 14 MORE IN THE NEXT FIVE YEARS.
1.4 billion
An Irish artist built an apartment made of bricks that include the SHREDDED REMAINS OF €1.4 BILLION he borrowed from Ireland’s national mint. Frank Buckley built the apartment in the lobby of a Dublin office building, which has remained vacant since its completion four years ago. “People were pouring billions into buildings now worth nothing,” says Buckley. “I WANTED TO CREATE SOMETHING FROM NOTHING.”
3,654
In feet, the proposed height of a NEW BUSINESS TOWER ON THE KHAZAR ISLANDS, a chain of 41 artificial islands in the Caspian Sea that also will include hotels and apartment buildings. The tower would be 27% TALLER than the current skyscraper champ, the BURJ KHALIFA IN DUBAI. Construction on the islands is set to begin at the end of 2013.
21,000
Number of NEW CONSTRUCTION JOBS created in January 2012, according to the Labor Department.
12
In years, the PEAK-TO-PEAK RECOVERY period for the cement industry. BY 2017, CEMENT CONSUMPTION IS EXPECTED TO REACH LEVELS LAST RECORDED IN 2005, according to the Portland Cement Association. A number of factors, including a reduction in office vacancy rates and high unemployment, contribute to the lengthy recovery period.
5
Total number of TEMPORARY LOADING BAYS being constructed at ONE WORLD TRADE CENTER. The Port Authority of New York and New Jersey revealed that the loading dock under the trade center will not be accessible for tenants to move their equipment into the 104-story tower when it opens. A TEMPORARY TRAIN STATION for the Port Authority is blocking access to the underground loading area.
0
Amount being charged by FRANK GEHRY for his work on the Culver City, Calif., home for the Jazz Bakery. Plans call for a two-story building with the main 250-seat concert room upstairs and a small black-box theater on the ground floor. THE FOOTPRINT OF THE BUILDING MEASURES ONE-SEVENTH OF AN ACRE.
1.3
In trillions, the GLOBAL REVENUE predicted from the CONSTRUCTION OF ZERO-ENERGY BUILDINGS over the next 23 years. The figure will reach almost $690 MILLION BY 2020 and $1.3 TRILLION BY 2035, according to a report published by Pike Research.
2,000
Total number of PV panels to be installed on the FIRST NET-ZERO SCHOOL in the northeast U.S. Located in the Rossville neighborhood in Staten Island, N.Y., PS 62 is slated to cost between $55-58 million, and will open in September 2015.
35
Current percentage of CONTRACTORS THAT ARE CURRENTLY USING BIM, up 8% from 2011, according the 2012 Construction Industry Hiring and Business Outlook conducted by the Associated General Contractors. 47% of survey respondents expect BIM usage to increase in 2012, depending on the market segment. +
Related Stories
| Sep 6, 2012
CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building
The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine.
| Sep 5, 2012
Pagano joins Thornton Tomasetti as Vice President in Newark office
Pagano is a Certified Energy Planner and Certified Energy Manager through the Association of Energy Engineers.
| Aug 30, 2012
John S Clark Co. completes teaching lab at UNC Wilmington
Three-story building provides offices, classrooms, and labs.
| Aug 29, 2012
BOND completes South Cove Community Health Center
$11 million, 21,000 square foot community health center opens in Quincy, Mass.
| Aug 29, 2012
Mamayek joins HDR as Design Principal in Boston
He will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.
| Aug 28, 2012
McCarthy begins construction on transportation center at Bob Hope Airport
Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.
| Aug 28, 2012
Wisnewski Blair & Associates changes name to HGA Mid-Atlantic
New name reflects firm's growing design resources on East Coast.
| Aug 24, 2012
Meis heads to Woods Bagot Sport
Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.
| Aug 21, 2012
Under 40 Leadership Summit slated for October 3-5 in Chicago
Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.