flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NUCONSTEEL CORPORATION OFFERS NUPRODUCTS, DIRECT TO CONSUMER

NUCONSTEEL CORPORATION OFFERS NUPRODUCTS, DIRECT TO CONSUMER


August 11, 2010


DENTON, TEXAS, JUNE 25, 2009--- NUCONSTEEL CORPORATION ANNOUNCES
NUPRODUCTSTM, ITS FIRST EVER LINE OF PRODUCTS SOLD DIRECT TO
THE CONSUMER. UTILIZING ITS AUTOMATED FRAMING SYSTEMS ROLL
FORMERS, NUCONSTEEL HAS DEVELOPED 7 PRODUCT LINES FOR
THE NUPRODUCTS BRAND.

NUPRODUCTS IS A LINE OF FULLY DESIGNED AND PRE-ENGINEERED
STANDARD MODEL PACKAGES UTILIZING COLD-FORMED STEEL TRUSSES
AND PANELIZED WALLS. THE PRODUCTS INCLUDE FRAMING PACKAGES
RANGING FROM STORAGE SHEDS AND HOMES TO METAL BUILDINGS AND
EQUESTRIAN STRUCTURES, ALL PRODUCED FROM 100% RECYCLABLE
STEEL.

WITHIN NUPRODUCTS, NUCONSTEEL HAS DESIGNED A SERIES OF GARAGES
AND HOMES MEETING CODE REQUIREMENTS WITHSTANDING UP TO 150
MILE PER HOUR WINDS INTENDED FOR COASTAL APPLICATIONS.

THE NUPRODUCTS LINE OF HOMES, GARAGES, SHEDS, STORM SHELTERS,
AND STORAGE AND METAL BUILDINGS PROVIDE SOLUTIONS FOR DO-ITYOURSELF
PROJECTS OR CONSUMERS AND ENTREPRENEURS LOOKING
FOR FRAMING PACKAGES TO PROVIDE A BUILDER FOR THEIR NEXT HOME
OR PROJECT.

VISIT WWW.NUCONSTEEL.COM FOR FURTHER INFORMATION.

NUCONSTEEL CORPORATION IS A SUBSIDIARY OF NUCOR (NYSE: NUE)
“NUCOR” AND HAS PROVIDED COLD-FORMED STEEL FRAMING IN THE
COMMERCIAL AND RESIDENTIAL MARKETS SINCE 2001.
®

Phone: 866.873.4832 525 South Locust Street, Denton, Texas 76201 USA

For More Information www.nuconsteel.com

boombox1
boombox2
native1

More In Category




Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021