Blue Lake Rancheria, in Northern California is an area vulnerable to wildfires, tsunamis, and earthquakes.
Considering those risks, the tribe that owns the casino property has created its own solar-powered microgrid that can disconnect from the main grid and run off Tesla battery power. The installation powers six buildings, including a 55,000 sf casino and 102 hotel rooms totaling more than 140,000 sf of space.
Six core buildings could last for months on solar power, supported with backup generators during the night or on cloudy days. Blue Lake Rancheria’s microgrid could provide other mountain towns with a template for building their own.
Microgrids could help reduce the incidences of wildfires in these areas, as sparks from electric equipment have been blamed for major fires including last year’s devastating blaze in Paradise, Calif. If the utility had cut power when winds near Paradise kicked up, that deadly wildfire might never have ignited. Microgrids with backup batteries allow buildings providing vital services to remain operational if the main grid fails or is shut down.
Related Stories
| Jun 21, 2012
On net-zero projects, Building Teams will be held accountable for energy-efficiency performance
The building team will be held accountable for how net-zero energy buildings perform two, five, and maybe ten years after completion.
| Jun 14, 2012
USGBC co-founder launches rating system for building product manufacturers
U.S. Green Building Council co-founder David Gottfried’s new venture, Regenerative Ventures, has established a rating system for building product manufacturers.
| Jun 14, 2012
Green standard set for single-ply roofing membrane
A sustainability standard has been established for single-ply roofing membranes used on commercial buildings.
| Jun 14, 2012
Minnesota Vikings stadium plan gets legislative go-ahead
Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.
| Jun 14, 2012
Report alleges New York’s prevailing construction wages are miscalculated, costing billions
A miscalculation in how prevailing wages are calculated in New York reportedly costs the state $3 billion a year in public-infrastructure projects.
| Jun 14, 2012
AGC, other business groups oppose hiring rules for disabled
Business groups have asked the U.S. Department of Labor to reconsider a proposed hiring quota aimed at federal contractors pertaining to people with disabilities.
| Jun 5, 2012
HP Labs aims for net-zero energy data centers
Building sustainable data centers is one of the goals of HP Labs, and it believes technology, combined with the right building techniques, could result in the construction of energy-efficient data centers.
| Jun 5, 2012
USGBC delays LEED 2012; renames it LEED v4
In response to concerns by LEED users, the U.S. Green Building Council (USGBC) announced that it will delay the ballot on LEED 2012 until June 1, 2013.