flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Northern California casino offers a template for resilient microgrids

Codes and Standards

Northern California casino offers a template for resilient microgrids

Solar power with batteries and backup generators provide weeks of self-reliance.


By Peter Fabris, Contributing Editor | May 23, 2019

Courtesy Pixabay

Blue Lake Rancheria, in Northern California is an area vulnerable to wildfires, tsunamis, and earthquakes.

Considering those risks, the tribe that owns the casino property has created its own solar-powered microgrid that can disconnect from the main grid and run off Tesla battery power. The installation powers six buildings, including a 55,000 sf casino and 102 hotel rooms totaling more than 140,000 sf of space.

Six core buildings could last for months on solar power, supported with backup generators during the night or on cloudy days. Blue Lake Rancheria’s microgrid could provide other mountain towns with a template for building their own.

Microgrids could help reduce the incidences of wildfires in these areas, as sparks from electric equipment have been blamed for major fires including last year’s devastating blaze in Paradise, Calif. If the utility had cut power when winds near Paradise kicked up, that deadly wildfire might never have ignited. Microgrids with backup batteries allow buildings providing vital services to remain operational if the main grid fails or is shut down.

Related Stories

Codes and Standards | Oct 10, 2018

Interactive heat maps track temperature ranges in U.S. cities

Urban heat island effect can vary by as much as 37°F in the same city.

Codes and Standards | Oct 9, 2018

Power systems will become more decentralized for better disaster resiliency

Businesses, homeowners will control more power-generation capacity.

Codes and Standards | Oct 5, 2018

Getting commitments from key subs critical on government contracts

Withdrawn subcontractor bids can be costly.

Codes and Standards | Oct 4, 2018

Internal watchdog says EPA falling short to protect school children from asbestos

Agency not conducting enough inspections, report says.

Codes and Standards | Oct 3, 2018

Climate change impacts could prompt realignment of assets for commercial property developers

Strategies include reducing exposure to properties in flood-prone areas.

Codes and Standards | Oct 2, 2018

Political will, tougher standards needed to reach carbon neutral goal

Stretch codes, more stringent credentials for designers, contractors, and inspectors may be needed.

Codes and Standards | Sep 27, 2018

Natural light is the most prized office perk

Employees crave sunshine and views of the outdoors more than cafeterias, fitness centers, and childcare.

Codes and Standards | Sep 26, 2018

Industry consensus needed for multifamily energy efficiency retrofit approach

Choice of insulating materials can impact indoor air quality, resident health.

Codes and Standards | Sep 25, 2018

New market forces disrupting global real estate development industry

Executives concerned about trade policy, labor shortages, approval processes.

Codes and Standards | Sep 21, 2018

More than 130 organizations petition OSHA to create heat protection standard for workers

Includes mandatory rest breaks, heat-exposure monitoring, record-keeping injury requirement.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021