The latest Construction Economic Update from the Associated Builders and Contractors (ABC) reported a 3.4% decline in nonresidential fixed investment during the first quarter of 2015. According to a recent gross domestic product report by the Bureau of Economic Analysis, the GDP rose by 0.2% during the same time.
This is the first time that nonresidential fixed investment declined since the first quarter of 2011, ABC reported.
Nonresidential fixed investment had been rising by more than 4% on an annualized basis during five of the previous six quarters.
Despite extreme weather across the country, nonresidential fixed investment expanded while energy prices were higher, causing the energy exploration, development, and distribution sectors to grow.
“Lower energy prices had an intense impact during the first quarter of 2015 and consumer spending was not enough to meaningfully offset the plummeting nonresidential fixed investment,” said ABC Chief Economic Anirban Basu. “Investment in equipment inched up just 0.1% and, while investment in intellectual property products expanded 7.8%, the third component, investment in structures, fell 23.1% during this year’s first quarter.”
Basu added that contractors and others in the building industry should remain positive in the continued expansion of the economy. Consumer spending is expected to pick up as the year goes on, which will help things return to normal levels during the second and third quarters of the year.
The following is first quarter performance of key segments:
- Personal consumption expenditures added 1.31% to GDP after contributing 2.98% in the fourth quarter.
- Spending on goods grew only 0.2% after a 4.8% increase in the fourth quarter.
- Real final sales of domestically products output – minus changes in private inventories – decreased 0.5% for the first quarter, after a 2.3% increase in the fourth quarter.
- Federal government spending expanded 0.3% in the first quarter following a 7.3% decrease in the prior quarter.
- Nondefense spending expanded 1.9% after increasing 1.5% in the fourth quarter of 2014.
- State and local government spending fell 1.5% during the first three months of the year after rising by 1.6% during the fourth quarter.
Related Stories
| Sep 13, 2010
Campus housing fosters community connection
A 600,000-sf complex on the University of Washington's Seattle campus will include four residence halls for 1,650 students and a 100-seat cafe, 8,000-sf grocery store, and conference center with 200-seat auditorium for both student and community use.
| Sep 13, 2010
Second Time Around
A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.
| Sep 13, 2010
Palos Community Hospital plans upgrades, expansion
A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation.
| Sep 13, 2010
China's largest single-phase hospital planned for Shanghai
RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.
| Sep 13, 2010
World's busiest land port also to be its greenest
A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.
| Sep 13, 2010
Triple-LEED for Engineering Firm's HQ
With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.
| Sep 13, 2010
'A Model for the Entire Industry'
How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.
| Sep 13, 2010
Committed to the Core
How a forward-looking city government, a growth-minded university, a developer with vision, and a determined Building Team are breathing life into downtown Phoenix.
| Sep 13, 2010
Conquering a Mountain of Construction Challenges
Brutal winter weather, shortages of materials, escalating costs, occasional visits from the local bear population-all these were joys this Building Team experienced working a new resort high up in the Sierra Nevada.