The latest Construction Economic Update from the Associated Builders and Contractors (ABC) reported a 3.4% decline in nonresidential fixed investment during the first quarter of 2015. According to a recent gross domestic product report by the Bureau of Economic Analysis, the GDP rose by 0.2% during the same time.
This is the first time that nonresidential fixed investment declined since the first quarter of 2011, ABC reported.
Nonresidential fixed investment had been rising by more than 4% on an annualized basis during five of the previous six quarters.
Despite extreme weather across the country, nonresidential fixed investment expanded while energy prices were higher, causing the energy exploration, development, and distribution sectors to grow.
“Lower energy prices had an intense impact during the first quarter of 2015 and consumer spending was not enough to meaningfully offset the plummeting nonresidential fixed investment,” said ABC Chief Economic Anirban Basu. “Investment in equipment inched up just 0.1% and, while investment in intellectual property products expanded 7.8%, the third component, investment in structures, fell 23.1% during this year’s first quarter.”
Basu added that contractors and others in the building industry should remain positive in the continued expansion of the economy. Consumer spending is expected to pick up as the year goes on, which will help things return to normal levels during the second and third quarters of the year.
The following is first quarter performance of key segments:
- Personal consumption expenditures added 1.31% to GDP after contributing 2.98% in the fourth quarter.
- Spending on goods grew only 0.2% after a 4.8% increase in the fourth quarter.
- Real final sales of domestically products output – minus changes in private inventories – decreased 0.5% for the first quarter, after a 2.3% increase in the fourth quarter.
- Federal government spending expanded 0.3% in the first quarter following a 7.3% decrease in the prior quarter.
- Nondefense spending expanded 1.9% after increasing 1.5% in the fourth quarter of 2014.
- State and local government spending fell 1.5% during the first three months of the year after rising by 1.6% during the fourth quarter.
Related Stories
| Feb 7, 2012
Thornton Tomasetti opens new office in Denver
The firm, which now has 25 offices internationally, opened the new office to better serve current and potential clients in the western Central region and Mountain States.
| Feb 6, 2012
Slight increase in nonres construction spending expected in 2012, growth projected for 2013
Commercial sector expected to lead real estate recovery.
| Feb 6, 2012
FMI releases 2012 Construction Productivity Report
Downsizing has resulted in retaining the most experienced and best-trained personnel who are the most capable of working more efficiently and harder.
| Feb 6, 2012
Kirchhoff-Consigli begins Phase 2 renovations at FDR Presidential Library and Museum
EYP Architecture & Engineering is architect for the $35 million National Archives Administration project.
| Feb 6, 2012
Batson-Cook announces the appointment of Hall as president
Hall will manage and direct all aspects of the firm’s day-to-day operations. He will be based in Batson-Cook’s Atlanta office.
| Feb 6, 2012
Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation
Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Feb 2, 2012
VLK Architects selected for new Cypress, Texas elementary school
The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.
| Feb 2, 2012
Mortenson Construction to build 2.4 MW solar project in North Carolina
Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.