flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nonresidential fixed investments fall in latest Construction Economic Update

Contractors

Nonresidential fixed investments fall in latest Construction Economic Update

This is the first time that nonresidential fixed investment declined since the first quarter of 2011, ABC reported. 


By BD+C Staff | May 1, 2015
Nonresidential fixed investments fall in latest Construction Economic Update

The newest Construction Econmic Update from ABC revealed that nonresidential fixed investments declined during the first three months of the year. Image: Pixabay

The latest Construction Economic Update from the Associated Builders and Contractors (ABC) reported a 3.4% decline in nonresidential fixed investment during the first quarter of 2015. According to a recent gross domestic product report by the Bureau of Economic Analysis, the GDP rose by 0.2% during the same time.

This is the first time that nonresidential fixed investment declined since the first quarter of 2011, ABC reported.

Nonresidential fixed investment had been rising by more than 4% on an annualized basis during five of the previous six quarters.

Despite extreme weather across the country, nonresidential fixed investment expanded while energy prices were higher, causing the energy exploration, development, and distribution sectors to grow.

“Lower energy prices had an intense impact during the first quarter of 2015 and consumer spending was not enough to meaningfully offset the plummeting nonresidential fixed investment,” said ABC Chief Economic Anirban Basu. “Investment in equipment inched up just 0.1% and, while investment in intellectual property products expanded 7.8%, the third component, investment in structures, fell 23.1% during this year’s first quarter.”

Basu added that contractors and others in the building industry should remain positive in the continued expansion of the economy. Consumer spending is expected to pick up as the year goes on, which will help things return to normal levels during the second and third quarters of the year.

The following is first quarter performance of key segments:

  • Personal consumption expenditures added 1.31% to GDP after contributing 2.98% in the fourth quarter.
  • Spending on goods grew only 0.2% after a 4.8% increase in the fourth quarter.
  • Real final sales of domestically products output – minus changes in private inventories – decreased 0.5% for the first quarter, after a 2.3% increase in the fourth quarter.
  • Federal government spending expanded 0.3% in the first quarter following a 7.3% decrease in the prior quarter.
  • Nondefense spending expanded 1.9% after increasing 1.5% in the fourth quarter of 2014.
  • State and local government spending fell 1.5% during the first three months of the year after rising by 1.6% during the fourth quarter.

Related Stories

Contractors | Mar 2, 2015

Nonresidential construction spending dips in January, still outpaced 2014

Nonresidential construction spending fell 2% in January, which is the largest setback to spending since January 2014, according to the March 2 release from the U.S. Census Bureau.

K-12 Schools | Mar 1, 2015

Are energy management systems too complex for school facility staffs?

When school districts demand the latest and greatest, they need to think about how those choices will impact the district’s facilities employees.

Industrial Facilities | Feb 27, 2015

Massive windmill will double as mixed-use entertainment tower in Rotterdam

The 571-foot structure will house apartments, a hotel, restaurants, even a roller coaster.

Office Buildings | Feb 26, 2015

Using active design techniques to strengthen the corporate workplace and enhance employee wellness

The new Lentz Public Health Center in Nashville, Tenn., serves as a model of how those progressive and healthy changes can be made.

K-12 Schools | Feb 26, 2015

Should your next school project include a safe room?

Many school districts continue to resist mandating the inclusion of safe rooms or storm shelters in new and existing buildings. But that may be changing.

K-12 Schools | Feb 26, 2015

Construction funding still scarce for many school districts

Many districts are struggling to have new construction and renovation keep pace with student population growth.

K-12 Schools | Feb 26, 2015

D.C.'s Dunbar High School is world's highest-scoring LEED school, earns 91% of base credits

The 280,000-sf school achieved 91 points, out of 100 base points possible for LEED, making it the highest-scoring school in the world certified under USGBC’s LEED for Schools-New Construction system.

K-12 Schools | Feb 25, 2015

Polish architect designs modular ‘kids city’ kindergarten using shipping container frames

Forget the retrofit of a shipping container into a building for one moment. Designboom showcases the plans of Polish architect Adam Wiercinski to use just the recycled frames of containers to construct a “kids city.”

Building Team | Feb 24, 2015

Call for entries: 2015 Giants 300 survey

The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue. 

Industrial Facilities | Feb 24, 2015

Starchitecture meets agriculture: OMA unveils design for Kentucky community farming facility

The $460 million Food Port project will define a new model for the relationship between consumer and producer.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021