flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nonresidential construction spending expands for seventh consecutive month

Contractors

Nonresidential construction spending expands for seventh consecutive month

Spending totaled $696.3 billion on a seasonally adjusted, annualized basis in August, a 0.3% increase from the previous month.


By ABC | October 1, 2015

Eight of 16 nonresidential construction sectors—including healthcare, manufacturing, and lodging—experienced spending increases in August on a monthly basis.

August marked the seventh consecutive month nonresidential construction spending expanded according to an Oct. 1 release supplied by the U.S. Census Bureau. Nonresidential spending totaled $696.3 billion on a seasonally adjusted, annualized basis in August, a 0.3% increase from the previous month and a 12.3% increase from the same time last year. The Census Bureau downwardly revised July's estimate from $696.1 billion to $694.1 billion.

"Job growth is fueling both consumer spending and the absorption of space, all of this is good for construction spending," said Associated Builders and Contractors Chief Economist Anirban Basu. "While construction spending has expanded by more than 12% over the past year, that is not to suggest that macroeconomic risks do not abound. Interest rates are likely to head higher going forward and there is no guarantee that energy prices will remain subdued. While low energy prices have caused some regional economies to slow, investment and spending has been bolstered in others.

"Recently, much attention has been focused on the global economic slowdown and the volatility of financial markets," said Basu. "The Federal Reserve's recent decision not to increase interest rates supported a developing narrative which suggests that the weakness now apparent in much of the world will eventually bring the U.S. into another recession."

 

 

Eight of 16 nonresidential construction sectors experienced spending increases in August on a monthly basis:

  • Lodging-related construction spending expanded 2.8% on a monthly basis and 41.4% on a year–over-year basis
  • Health care-related construction spending grew 1.9% on a monthly basis and 9.1% on a yearly basis
  • Public safety-related construction spending expanded 0.4% in August and is 0.2% higher than last year
  • Spending in the amusement and recreation category grew 1.3% for the month and 34.7% from the same time last year
  • Transportation-related construction spending grew 1.4% in August and is up 12.1% from the same time last year
  • Communication-related construction spending is up 0.4% for the month and 11.5% on a yearly basis
  • Power-related construction spending expanded 1.2% month-over month but is down 6.7% year-over-year
  • Manufacturing-related construction spending expanded 1.3% on a monthly basis and 57.6% on a yearly basis

Spending in half of the nonresidential construction subsectors fell in August on a monthly basis:

  • Highway and street-related construction spending fell by 0.6% in August but is up 7% from the same time last year
  • Sewage and waste disposal-related construction spending is 0.3% lower from July 2015 but 9% higher than in August 2014
  • Water supply-related construction spending is down 0.2% for the month but is up 4.9% over the past 12 months
  • Conservation and development-related construction spending fell 0.9% for the month but is up 12.7% from the same time last year
  • Office-related construction spending dipped 0.2% lower in August but is up 25.4% since the same time last year
  • Spending in the commercial category fell 1.2% for the month but grew 1.3% over the past 12 months
  • Educational-related construction spending inched 0.6% lower for the month but is up 5.0% year-over-year
  • Religious-related construction spending fell 9.4% for the month and 4.6% from August 2014

To view the previous spending report, click here.

Related Stories

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021