flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nonresidential construction finally gaining momentum: Gilbane summer economic report

Nonresidential construction finally gaining momentum: Gilbane summer economic report

Gilbane Building Company reports growth in nonresidential construction spending starting this spring; availability of skilled workers will be a pressing issue.


By Gilbane Building Company | August 15, 2013

Providence, RI – August 15, 2013 – Gilbane Building Company today announces the publication of the Summer 2013 edition of Construction Economics – Market Conditions in Construction. Based on an array of economic data, construction starts, and material cost trends, the data continues to show positive growth for the industry.

 “Supported by overall positive growth trends for year 2013, I expect margins and overall escalation to climb more rapidly than we’ve seen in five years,” says Ed Zarenski, the report’s author and a 40-year veteran of the construction industry. “Rates will continue to rise and borrowing costs will add potential cost to future funding of projects.  The cheapest time to build is now behind us. ”

According to the report, work activity in nonresidential buildings construction slowed in the first five months but is expected to increase substantially in the second half of 2013. Other highlights include:

  • Construction Spending for 2013 will finish the year 5% higher than 2012.  All of the growth will be attributed to residential construction.
  • The backlog of construction starts from the last two years indicates an upturn in nonresidential spending starting in May 2013.
  • The Dodge Momentum Index (DMI), although down recently, is still well up since the mid-2011 bottom indicating growth.
  • Along with the DMI, McGraw Hill New Construction Starts and the Architectural Billings Index – both leading indicators – all indicate an increasing rate of activity in the second half of 2013.
  • The construction workforce is still 25% below the peak. As workload expands in the next few years, a shortage of available skilled workers may have a detrimental effect on cost, productivity and the ability to readily increase construction volume.
  • Comments regarding the outlook for economic stimulus have recently caused interest rates to increase rapidly.  Lending criteria is still tight and borrowers are cautious about taking on new debt. 

This free report and its executive summary are available for download at http://info.gilbaneco.com/construction-economics-summer-2013

 About Gilbane, Inc.

Gilbane provides a full slate of construction and facilities-related services – from pre-construction planning and integrated consulting capabilities to comprehensive construction management, close-out and facility management services – for clients across various markets. Marking its 140th year in operation and still a privately held, family-run company, Gilbane has more than 60 office locations around the world. To find out what the next 140 years have in store, visit www.gilbaneco.com.

 

 

Related Stories

| Nov 4, 2011

McCarthy completes construction of South Region High School No. 2 in Los Angeles

Despite rain delays and scope changes, the $96.7 million high school was completed nearly two-months ahead of schedule.

| Nov 4, 2011

Two Thornton Tomasetti projects win NCSEA’s 2011 Excellence in Structural Engineering Awards

Altra Sede Regione Lombardia and Bank of Oklahoma Center both recognized.

| Nov 3, 2011

GREC Architects announces opening of the Westin Abu Dhabi Golf Resort and Spa

The hotel was designed by GREC and an international team of consultants to enhance the offerings of the Abu Dhabi Golf Club without imposing upon the dramatic landscapes of the elite golf course.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Nov 3, 2011

2012 Pritzker Architecture Prize Ceremony to be held in China

The tradition of moving the event to world sites of architectural significance was established to emphasize that the prize is international, the laureates having been chosen from 16 different nations to date. 

| Nov 3, 2011

DMR Architects welcomes two new staff members

Siro Gonzalez joins the staff as junior graduate architect and Megan Byers joins the staff as marketing assistant.

| Nov 2, 2011

Mega deals drive 28% increase in global engineering and construction merger and acquisition value

Financial investors lead mega deal activity, China most active country in global domestic deals.

| Nov 2, 2011

Alexandria Real Estate Equities, Inc. breaks ground on Alexandria Center in Cambridge, Mass.

307,000-sf building to be house to executive offices of Biogen Idec.

| Nov 2, 2011

CRSI’s Manual of Standard Practice now available

This resource contains information on recommended industry practices for estimating, detailing, fabricating, and placing reinforcing steel for reinforced concrete construction. 

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021