flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

No ease of lumber price spikes in sight

Codes and Standards

No ease of lumber price spikes in sight

Wildfires strike Northwest timber industry in wake of Covid-19 shutdowns.


By Peter Fabris, Contributing Editor | September 21, 2020

Courtesy Pixabay

It’s been a wild ride in 2020 for the U.S. timber industry, and the run up in prices shows no sign of easing.

First, mills temporarily shut down in March due to the COVID-19 pandemic. Then, in September in the timber nexus of the Northwest, wildfires have burned out of control threatening some timber plants.

After the COVID shutdown, homebuilders embarked on a surge of new house starts, while many homeowners took on home repairs and remodeling jobs during quarantine. The result has been a dramatic spike in demand accompanied by a supply shortage.

Lumber futures have climbed 50% this year, with prices on pace for the largest gain since 1993. The fires have prompted logging bans, closed railroad lines, and shuttered mills. Lumber commodity prices are expected to continue to be high well into 2021.

The average price of a new multifamily home has increased by $6,107 from mid-April to August due to higher material costs.

Related Stories

Codes and Standards | Feb 10, 2021

More than two-thirds of construction companies say COVID-19 has not impacted their ESOP

Half of survey respondents say 2020 project profitability decreased due to pandemic.

Codes and Standards | Feb 9, 2021

New Jersey approves new electric vehicle-ready home requirement

Homebuyers must be given option for charging station on new construction.

Codes and Standards | Feb 9, 2021

New California law removes barriers to residential development

Measure removes restrictions for ADUs in urban areas and master planned communities.

Codes and Standards | Feb 8, 2021

Alliance yields more accurate data for rating and certifying systems of construction materials

Crosswalk API offers trusted format to specify and procure healthier products.

Codes and Standards | Feb 4, 2021

2021 IBC requires automatic doors for entrances to public buildings

One door must be either a full power-operated door or a low-energy power-operated door.

Codes and Standards | Feb 3, 2021

Two new International Code Council online code tools released

Offer detailed information about global building code usage and U.S. adoptions.

Codes and Standards | Feb 2, 2021

Biden tells OSHA to bolster COVID-19 safety rules

Order could lead to a national playbook for fighting COVID-19 on jobsites.

Codes and Standards | Feb 1, 2021

Fenestration Alliance updates standard for mulled combination assemblies

Last updated in 2010, document describes procedures and requirements for air leakage, water resistance, and structural performance.

Codes and Standards | Jan 28, 2021

Natl. Fire Protection Assn. releases new energy storage system fact sheet

Comes as Biden Administration prepares ambitious clean energy agenda.

Codes and Standards | Jan 27, 2021

AECOM sues insurance carrier for payment of COVID-19 property damage claims

Claims ‘all-risk policies’ should have included millions of dollars of losses due to virus.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021