flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Aug 8, 2019

More designers focusing on acoustic properties of buildings

Recognition that structures should be acoustically satisfying.

Codes and Standards | Aug 6, 2019

New technology, aligning training with local trends among keys to workforce development

Construction industry must also invest in training, recruiting high school students.

Codes and Standards | Aug 1, 2019

Planners, city official rethink parking requirements on new projects

Reducing number of parking spots frees up land for ‘more purposeful’ uses.

Codes and Standards | Jul 31, 2019

USGBC-LA chooses first ‘Net Zero Accelerator’ technologies

Wide range of solutions address numerous environmental challenges.

Codes and Standards | Jul 30, 2019

Solar brokerage will provide financing for small/medium businesses

First to fund solar for smaller-scale commercial operations.

Codes and Standards | Jul 29, 2019

ASCE group unveils structural safety database

Confidential reporting on structural failures, near misses, and other incidents.

Codes and Standards | Jul 26, 2019

Floating landscape infrastructure wins top ASCE innovation prize

Climate resiliency a key theme of entrants.

Codes and Standards | Jul 24, 2019

New York making slow progress on resiliency seven years after Hurricane Sandy

Property owners face many challenges; coastal defense project plans are complex and need more time to plan.

Codes and Standards | Jul 23, 2019

Berkeley, Calif. passes nation’s first ordinance to make new buildings all-electric

No gas hook-ups will be allowed in new houses, apartments, and commercial buildings.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021