flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Nov 19, 2019

Most U.S. voters support licensing standards for architects

NCARB survey shows strong support for architecture as a licensed profession.

Codes and Standards | Nov 18, 2019

Cambridge, Mass., teams up with utility on energy retrofit program

Buildings large than 25,000 sf targeted in initiative to further carbon neutrality goal.

Codes and Standards | Nov 14, 2019

Resistance to Toronto’s ‘smart city’ reveals pitfalls of such ambitious projects

Concerns over data privacy, governance, feasibility prompt criticism.

Codes and Standards | Nov 13, 2019

Heat pumps, strategic energy management could be next major focuses for efficiency

After lighting, efficiency experts look to new opportunities to boost energy efficiency.

Codes and Standards | Nov 12, 2019

National Infrastructure Performance Council to address ‘national security crisis’

Coalition wants to double annual level of infrastructure investment.

Codes and Standards | Nov 11, 2019

Major cities are adopting new building performance standards

Initiatives can include multiple standards.

Codes and Standards | Nov 11, 2019

U.S. hotel construction pipeline continues its year-over-year growth

In its eighth consecutive quarter of growth, projects currently under construction stand at 1,729 projects/235,278 rooms.

Codes and Standards | Nov 11, 2019

New retrofit design guide for metal roofing published

Metal Construction Association document provides best practices for re-roofing with metal.

Codes and Standards | Nov 8, 2019

New York City among the top hotel construction pipelines in the United States

Hotels presently under construction are at 102 projects/17,504 rooms.

Codes and Standards | Nov 7, 2019

Group focused on using AI for construction safety gains key members

Major contractors join partnership to share data to predict hazards, incidents.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021