flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Apr 13, 2020

What building science says about reducing COVID-19 transmission

Impact of temperature and relative humidity is unclear.

Codes and Standards | Apr 9, 2020

Owners retrofitting properties, monitoring performance during epidemic

Covid-19 outbreak may lead employers to reevaluate office commitments.

Codes and Standards | Apr 7, 2020

Dept. of Labor publishes guidance on paid sick leave, expanded family and medical leave

Includes fact sheets for employees, employers, and a questions and answers document.

Codes and Standards | Apr 1, 2020

Standards and codes meetings halted, postponed

ASTM International cancels in-person standards meetings; DOE’s National Energy Codes Conference postponed.

Codes and Standards | Mar 26, 2020

Ransomware attack on Canadian contractor underscores need for cybersecurity

Victimized company Bird Construction has defense, law enforcement contracts.

Codes and Standards | Mar 23, 2020

Contractors should scrutinize contracts carefully amid Covid-19 crisis

Compliance with time-sensitive notice requirements and careful documentation required.

Codes and Standards | Mar 23, 2020

Florida legislature passes bill to reduce retainage on state and local projects

House and Senate vote is nearly unanimous; law would go into effect Oct. 1.

Codes and Standards | Mar 20, 2020

Feds prod use of eminent domain to force people out of flood-prone homes

Local officials that don’t comply could lose federal money to combat climate change.

Codes and Standards | Mar 19, 2020

ASHRAE provides COVID-19 resources for operating, maintaining HVAC systems

Includes recently approved position document on Airborne Infectious Diseases.

Codes and Standards | Mar 19, 2020

CaGBC launches new version of its Zero Carbon Building Standard

Version 2 draws on lessons from more than 20 zero carbon projects.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021