flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Feb 8, 2021

Alliance yields more accurate data for rating and certifying systems of construction materials

Crosswalk API offers trusted format to specify and procure healthier products.

Codes and Standards | Feb 4, 2021

2021 IBC requires automatic doors for entrances to public buildings

One door must be either a full power-operated door or a low-energy power-operated door.

Codes and Standards | Feb 3, 2021

Two new International Code Council online code tools released

Offer detailed information about global building code usage and U.S. adoptions.

Codes and Standards | Feb 2, 2021

Biden tells OSHA to bolster COVID-19 safety rules

Order could lead to a national playbook for fighting COVID-19 on jobsites.

Codes and Standards | Feb 1, 2021

Fenestration Alliance updates standard for mulled combination assemblies

Last updated in 2010, document describes procedures and requirements for air leakage, water resistance, and structural performance.

Codes and Standards | Jan 28, 2021

Natl. Fire Protection Assn. releases new energy storage system fact sheet

Comes as Biden Administration prepares ambitious clean energy agenda.

Codes and Standards | Jan 27, 2021

AECOM sues insurance carrier for payment of COVID-19 property damage claims

Claims ‘all-risk policies’ should have included millions of dollars of losses due to virus.

Codes and Standards | Jan 26, 2021

Updated guide to repair and rehabilitate existing concrete structures published

Document assesses how to adhere to code requirements.

Codes and Standards | Jan 25, 2021

New guide for skylight selection, daylighting design released

Free Fenestration and Glazing Industry Alliance document now available.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021