flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Jan 25, 2022

Modeling tool helps compare options for HVAC systems when little known about a building

Compares projected costs and energy usage for all HVAC systems and hot water consumption.

Codes and Standards | Jan 25, 2022

Critics slam proposed revamp of California’s solar net energy metering rate

Could make rooftop solar panels unaffordable for most customers.

Sponsored | Resiliency | Jan 24, 2022

Norshield Products Fortify Critical NYC Infrastructure

New York City has two very large buildings dedicated to answering the 911 calls of its five boroughs. With more than 11 million emergency calls annually, it makes perfect sense. The second of these buildings, the Public Safety Answering Center II (PSAC II) is located on a nine-acre parcel of land in the Bronx. It’s an imposing 450,000 square-foot structure—a 240-foot-wide by 240-foot-tall cube. The gleaming aluminum cube risesthe equivalent of 24 stories from behind a grassy berm, projecting the unlikely impression that it might actually be floating. Like most visually striking structures, the building has drawn as much scorn as it has admiration. 

Codes and Standards | Jan 24, 2022

N.Y. governor calls for ban on natural gas in new buildings

Action follows New York City’s ban.

Codes and Standards | Jan 19, 2022

EPA may expand product lineup that can earn WaterSense label

Would include systems that enhance water quality at the tap.

Codes and Standards | Jan 19, 2022

Canada’s Trudeau seeking building codes changes, net-zero emissions building strategy

Prime minister also wants net-zero electricity grid by 2035.

Codes and Standards | Jan 18, 2022

Greater emphasis on building materials needed to achieve net-zero carbon offices

Engineered wood, straw, and bamboo can be keys to achieving goal.

Codes and Standards | Jan 17, 2022

AISC seeks comments on draft earthquake standard for steel buildings

Includes new limits for cross-sectional slenderness of steel columns based on latest research.

Codes and Standards | Jan 12, 2022

California’s wildfire building code significantly reduces structural loss

As other states consider upgrading their codes, Golden State provides useful model.

boombox1
boombox2
native1

More In Category


Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021