flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

| Jun 14, 2012

USGBC co-founder launches rating system for building product manufacturers

U.S. Green Building Council co-founder David Gottfried’s new venture, Regenerative Ventures, has established a rating system for building product manufacturers.

| Jun 14, 2012

Green standard set for single-ply roofing membrane

A sustainability standard has been established for single-ply roofing membranes used on commercial buildings.

| Jun 14, 2012

Minnesota Vikings stadium plan gets legislative go-ahead

Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.

| Jun 14, 2012

Report alleges New York’s prevailing construction wages are miscalculated, costing billions

A miscalculation in how prevailing wages are calculated in New York reportedly costs the state $3 billion a year in public-infrastructure projects.

| Jun 14, 2012

AGC, other business groups oppose hiring rules for disabled

Business groups have asked the U.S. Department of Labor to reconsider a proposed hiring quota aimed at federal contractors pertaining to people with disabilities.

| Jun 5, 2012

HP Labs aims for net-zero energy data centers

Building sustainable data centers is one of the goals of HP Labs, and it believes technology, combined with the right building techniques, could result in the construction of energy-efficient data centers.

| Jun 5, 2012

USGBC delays LEED 2012; renames it LEED v4

In response to concerns by LEED users, the U.S. Green Building Council (USGBC) announced that it will delay the ballot on LEED 2012 until June 1, 2013.

| Jun 5, 2012

Baltimore officials vow to block $1.8 billion urban renewal project

Baltimore officials want to block a $1.8 billion urban renewal project until more neighborhood residents and minority contractors are hired and displaced residents can benefit from the revitalization.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021