flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nine out of 10 New York City building plans fail energy code test

Nine out of 10 New York City building plans fail energy code test

Changes to the code planned for next year creating concerns


By BD+C Staff | September 10, 2014
Midtown from Brooklyn Bridge. Photo: Mark Jaroski. Licensed under Creative Commo
Midtown from Brooklyn Bridge. Photo: Mark Jaroski. Licensed under Creative Commons

Earlier this year, New York City's Department of Buildings began auditing thousands of architectural plans for new and renovated office and residential buildings. Nine of every 10 have failed to meet the energy code, a 30-year-old set of standards.

The compliance enforcement effort began under Mayor Michael Bloomberg last year, when he assigned auditors to pore over 212 randomly selected building plans. This year, auditors have examined more than 1,200 applications.

The standards are only now being enforced in earnest. In some cases, the Department of Buildings has stopped nonconforming projects. “We're very serious about this, and are trying to educate the industry on what is required,” said Gina Bocra, chief sustainability officer at the Department of Buildings, which set up a permanent audit unit this year. “Buildings are the largest source of energy consumption in our city, and how we conserve energy is key to making progress on reducing greenhouse-gas emissions.”

Some are complaining about the potential costs of compliance and potential to lengthen construction schedules. Planned additions to the building code over the next year are boosting concerns. “The energy code can be an effective way to increase efficiency if it remains flexible, but the more mandatory and prescriptive any code is, the more difficult it is to build a building that complies — particularly in New York City,” said Angela Pinsky, a senior vice president of management services and government affairs with the Real Estate Board of New York.

(http://www.businessinsurance.com/article/20140818/NEWS07/140819859?tags=|338|69|310|80|303)

Related Stories

Codes and Standards | Jan 9, 2017

China claims top ranking outside of U.S. for total LEED-certified space

Canada, India, Brazil, and Korea round out top 5.

Codes and Standards | Jan 6, 2017

OSHA prompts more proactive approach to construction site safety

Remote operated camera systems are being used to mitigate risk in real time.

Codes and Standards | Jan 5, 2017

2018 building energy code upholds efficiency gains

Efforts to scale back efficiency requirements largely defeated.

Codes and Standards | Jan 4, 2017

Low-income housing doesn’t lower neighborhood housing values

A Trulia study contradicts longstanding fears.

Codes and Standards | Jan 3, 2017

Intelligent transportation systems have implications for designers, construction firms

Sensors and Internet of Things devices will have to be embedded in infrastructure.

Codes and Standards | Dec 15, 2016

OSHA releases safety recommendation guide for construction industry

It is said to be most helpful to small and mid-sized contractors.

Codes and Standards | Dec 14, 2016

Cities must invest $375 billion to avoid catastrophic global climate change

C40 Cities Climate Leadership Group advocates low carbon infrastructure.

Codes and Standards | Dec 14, 2016

Resilient construction techniques pay for themselves over lifetime of buildings

Spending $340,000 for resiliency would pay for itself over the lifetime of a $10 million structure.

Codes and Standards | Dec 12, 2016

Dept. of Energy launches program to advance zero energy school design

Six school districts and two states are among the first to mainstream zero energy schools.

Codes and Standards | Dec 9, 2016

California city’s plan for net zero building includes net zero water usage

Santa Monica city services building aims for highest level of sustainability.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021