flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nifty video shows planned development of La Sagrada Familia basilica

Nifty video shows planned development of La Sagrada Familia basilica

After 144 years, construction on Gaudí's iconic Barcelona edifice is picking up speed, with a projected end date of 2026.


By BD+C Staff | October 4, 2013

A new video by La Sagrada Familia Foundation combines aerial footage and computer animation to reveal planned development and the finished building.

The structure now has a target completion date of 2026, the 100th anniversary of the death of architect Antoni Gaudí.

The Barcelona landmark has been in the works for the past 144 years, and represents a unique take on design and construction, including groundbreaking use of the principle of biomimicry. About 65% of the church has been completed, but large sections of the central portion and façades have yet to be built. The main Jesus tower will be 560 feet high, surrounded by 12 shorter towers named for the apostles, four for the evangelists, and one for the Virgin Mary. If completed as planned, the structure will be the world's tallest church building.

Catch the flyover here.

Related Stories

| Apr 2, 2012

Mitsubishi unveils ultra-high-speed elevator for Shanghai skyscraper

The operation of the elevator is scheduled to begin in 2014.

| Apr 2, 2012

Sachse Construction helps complete Salt Lake City’s City Creek Center

Sachse was hired to complete store build-outs at City Creek Center.

| Apr 2, 2012

Culver joins Sasaki as managing director

Culver will work closely with Sasaki firm leaders on issues of strategy, marketing, and business development.

| Apr 2, 2012

EB-5 investment funds new Miramar, Fla. business complex

Riviera Point Holdings breaks ground on $17 million office center.

| Mar 30, 2012

New windows and doors revitalize older buildings

With their improved aesthetics, energy efficiency, and durability, replacement windows and doors can add significant value to a renovation project.

| Mar 30, 2012

18 handy tablet apps for AEC professionals

Check out these helpful apps for everyday design and construction tasks. Our favorite: MagicPlan, which uses GPS to help you measure and draw a floor plan of any room.

| Mar 29, 2012

U.K.’s Manchester Airport tower constructed in nine days

Time-lapse video shows construction workers on the jobsite for 222 continuous hours.

| Mar 29, 2012

Roller shade operating system wins IF Product Design Award

Design experts in the iF jury recognized the engineering invested in the RB 500 Roller Shade, including a metal clutch with a patented construction, a durable zamac housing with polished finish, and a chain drive unit that excels in maximum operating comfort.

| Mar 29, 2012

Lehigh engineering student wins Thornton Tomasetti Foundation Awards Scholarship

The scholarship is awarded annually to a graduate student in structural engineering deemed by the department to have the potential to make an impact in the field professionally.

| Mar 29, 2012

Construction completed on Las Vegas’ newest performing arts center

The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021