An enormous crane weighing nearly 320 tons with a boom able to reach farther than a football field has arrived for duty on the campus of Scripps Memorial Hospital La Jolla, Calif. The crane signifies the next phase in construction of the Scripps Prebys Cardiovascular Institute as crews begin placing the 5,900 tons of steel that will be used to form the structure of the 168-bed hospital tower.
The $456 million Scripps Prebys Cardiovascular Institute is scheduled to open for patient care in 2015. The 383,000-sf building will feature108 inpatient beds in private rooms, 60 intensive care beds, six state-of-the-art operating rooms, and as many as six cardiac catheterization labs with the most advanced medical technology.
The Scripps Prebys Cardiovascular Institute will integrate the highly respected cardiovascular programs throughout the Scripps Health system and Kaiser Permanente. The Institute will build on a legacy of Scripps breakthroughs in pioneering surgical procedures, landmark studies, genomic medicine and wireless technology to provide the most advanced treatment options available to patients with cardiovascular diseases. Every year, more than 55,000 patients receive their cardiovascular care from Scripps, making it the largest heart care provider in the region. And Scripps is the only cardiovascular program in the region consistently recognized by U.S. News & World Report as one of the best in the country.
Jacobs Engineering Group Inc. is serving as the construction management firm on behalf of Scripps Health. McCarthy Building Companies, Inc. has been retained as the design-assist general contractor and HOK Architects is the project architect. BD+C
Related Stories
| Jun 30, 2014
Zaha Hadid's Iraq Parliament complex design marred with controversy
Zaha Hadid's design for the Iraq Parliament was selected, despite placing third in the original RIBA-organized competition.
Sponsored | | Jun 27, 2014
SAFTI FIRST Now Offers GPX Framing with Sunshade Connectors
For the Doolittle Maintenance Facility, SAFTI FIRST provided 60 minute, fire resistive wall openings in the exterior using SuperLite II-XL 60 insulated with low-e glazing in GPX Framing with a clear anodized finish.
| Jun 26, 2014
Glazing offers peace-of-mind for hurricane season
SPONSORED CONTENT As hurricane season kicks into high gear, it reinforces the importance of balancing the aesthetic and daylight enhancements of glazing with the safety requirements to protect people and structures from hurricane-force winds.
| Jun 26, 2014
Plans for Britain’s newest landmark brings in international cooperation
Designers of the London Eye will team up with companies from France, the Netherlands and the United States to construct i360 Brighton, the U.K.'s newest observation tower.
| Jun 25, 2014
The best tall buildings of 2014
Four high-rise buildings from multiple continents have been selected as the best of their region. The best worldwide tall building will be announced November 6.
| Jun 25, 2014
AIA Foundation launches Regional Resilient Design Studio
The Studio is the first to be launched as part of the AIA Foundation’s National Resilience Program, which plans to open a total of five Regional Resilience Design Studios nationwide in collaboration with Architecture for Humanity, and Public Architecture.
| Jun 25, 2014
Frank Lloyd Wright’s Spring House, Cincinnati’s Union Terminal among 11 Most Endangered Historic Places for 2014
The National Trust for Historic Preservation released its annual list of 11 Most Endangered Historical Sites in the United States for 2014.
| Jun 25, 2014
Best of Britain: 56 buildings make it to the RIBA Stirling Prize's longlist
The longlist for the 2014 prize includes Foster + Partners' Marseille and London's now-famous Shard, designed by Renzo Piano.
| Jun 25, 2014
Green Building Initiative Announces New Appointments to Board
Glumac consulting engineer CEO Steve Straus and Plum Creek director of real estate Doug Cole join GBI's board of directors.
| Jun 25, 2014
Taking a page from Lean manufacturing for improved design review processes
SPONSORED CONTENT As more building project teams look for ways to collaborate better, technology continues to provide solutions. Yet, as I learned from the experience of one of my customers, choosing the wrong technology can have an underwhelming effect, causing a team to simply swap out old challenges for new ones.