flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

‘Next generation’ biomanufacturing plant will be the first of its kind in the U.S.

Industrial Facilities

‘Next generation’ biomanufacturing plant will be the first of its kind in the U.S.

The plant will be located in Rhode Island.


By David Malone, Associate Editor | April 12, 2018

Amgen, a biotechnology company, is expanding in Rhode Island with a new $160-million next generation biomanufacturing plant that will be the first of its kind in the United States (Amgen previously built a next-generation biomanufacturing plant in Singapore).

The plant will be built on the current 75-acre Amgen Rhode Island campus in West Greenwich. The facility will incorporate multiple innovative technologies into a single facility, which will allow it to be built in half the construction time with approximately half of the operating cost required of a traditional plant.

Next-gen biomanufacturing plants require a smaller manufacturing footprint (traditional plants require as much space as 12 football fields) and offer greater environmental benefits such as reduced water and energy consumption and lower levels of carbon emissions and solid waste. Instead of large, stainless steel storage tanks that are welded together in place, next-gen equipment is disposable, modular, and reconfigurable.

The new plant is expected to produce 150 manufacturing jobs and is expected to add $3.7 million in net revenue to the state over the 12-year commitment period.

Related Stories

Game Changers | Feb 5, 2016

Tesla: Battery storage is not just about electric vehicles

With his $5 billion, 13.6 million-sf Gigafactory, Tesla’s Elon Musk seeks to change the economics of battery energy storage, forever. 

Game Changers | Feb 4, 2016

GAME CHANGERS: 6 projects that rewrite the rules of commercial design and construction

BD+C’s inaugural Game Changers report highlights today’s pacesetting projects, from a prefab high-rise in China to a breakthrough research lab in the Midwest.

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Giants 400 | Sep 10, 2015

INDUSTRIAL SECTOR GIANTS: Stantec, Turner, Jacobs among top industrial AEC firms

BD+C's rankings of the nation's largest industrial sector design and construction firms, as reported in the 2015 Giants 300 Report

Industrial Facilities | Sep 3, 2015

DATA CENTER SECTOR GIANTS: Fluor, Gensler, Holder Construction among top data center AEC firms

BD+C's rankings of the nation's largest data center sector design and construction firms, as reported in the 2015 Giants 300 Report

Industrial Facilities | Aug 18, 2015

BIG crowdfunds steam ring prototype for Amager Bakke power plant project

The unusual power plant/ski slope project in Copenhagen will feature a smokestack that will release a ring-shaped puff for every ton of CO2 emitted.

Sponsored | Industrial Facilities | Aug 17, 2015

California wastewater agency wins with radiant technology

The Big Bear Area Regional Wstewater Agency tried several different methods to dry the sludge with only marginal success, so they decided to devise a new system that would be more effective, more efficient and would reduce the odor complaints.

Industrial Facilities | Aug 3, 2015

Architect Jacques Rougerie envisions floating city to function as roving laboratory

The manta ray-shaped vessel will be completely self-sustaining, run on marine energy, and produce no waste. 

Contractors | Jul 29, 2015

Consensus Construction Forecast: Double-digit growth expected for commercial sector in 2015, 2016

Despite the adverse weather conditions that curtailed design and construction activity in the first quarter of the year, the overall construction market has performed extremely well to date, according to AIA's latest Consensus Construction Forecast.

University Buildings | Jul 21, 2015

Maker spaces: Designing places to test, break, and rebuild

Gensler's Kenneth Fisher and Keller Roughton highlight recent maker space projects at MIT and the University of Nebraska that provide just the right mix of equipment, tools, spaces, and disciplines to spark innovation. 

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021