Nexii Building Solutions, which recently completed a first-of-its-kind Starbucks in Abbotsford, B.C., has now completed the first sustainably constructed Popeyes restaurant in Canada.
Also located in Abbotsford, the new restaurant was built in under two weeks. Nexii’s high-performanve green building products are precision manufactured in plants to project specifications using 3D software. This process means the Nexii panels are able to fit together like jigsaw pieces onsite, accelerating standard build times by between 50% and 75%. The process also enables Nexii to eliminate almost all onsite construction waste.
Nexiite, Nexii’s proprietary material used within its building panels, is more thermally efficient and less carbon-intensive than concrete. When assembled, the Nexii panels create an airtight building envelope. Nexii estimates the Popeyes restaurant’s operational building carbon emissions will be reduced by approximately 30%.
The Popeyes restaurant is expected to open to the public by the fall of 2021.
Related Stories
| Oct 7, 2011
GREENBUILD 2011: UL Environment releases industry-wide sustainability requirements for doors
ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements.
| Oct 7, 2011
GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field
White paper defines EPD, details development process, and identifies emerging trends for manufacturers, architects, designers, and buyers.
| Oct 5, 2011
GREENBUILD 2011: Roof hatch designed for energy efficiency
The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance.
| Sep 28, 2011
GBCI announces LEED fellow class of 2011
LEED Fellows represent green building industry's most accomplished professionals.
| Sep 14, 2011
Empire State Building achieves LEED Gold ?
The 2.85 million-sf building is celebrating its 80th anniversary while nearing completion of its renewal and repurposing to meet the needs of 21st Century businesses.
| Sep 12, 2011
Construction waste management
Best practices for an environmentally optimized job site.
| May 25, 2011
Low Impact Development: Managing Stormwater Runoff
Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.
| May 25, 2011
Smithsonian building $45 million green lab
Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.
| May 20, 2011
Chicago leads the nation in LEED-certified square footage
The U.S. Green Building Council reports that Chicago has the highest number of square feet of LEED-certified green building projects nationally with 71 million square feet.