flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

News Briefs: Design firms say they need more project management training...  Jones named director of GSA's Design Excellence program... Carbon prices running out of gas in Northeast cap and trade market

News Briefs: Design firms say they need more project management training...  Jones named director of GSA's Design Excellence program... Carbon prices running out of gas in Northeast cap and trade market


August 11, 2010
This article first appeared in the 200908 issue of BD+C.

Design firms say they need more project management training. Nearly one-third (32%) of design and environmental firms report that project management training is their biggest training need, according to a survey in The Zweig HR Letter. Next in importance: marketing and business development training (19%) and leadership training (16%).Carbon prices running out of gas in Northeast cap and trade market. The price of carbon permits plummeted 8% for the Regional Greenhouse Gas Initiative (RGGI), which requires utilities in the Northeast to purchase carbon permits for each ton of carbon they emit. Lower demand for electricity as a result of the recession was the cause of the price plummet. More than 30 million permits (or allowances) had cleared at $3.23 each in a sale on June 17, 8% lower than the auction price in March.First green roof professionals certified. Green Roofs for Healthy Cities announced the first wave of accredited green roof professionals. These individuals have successfully completed a multidisciplinary exam encompassing five areas of concentration, including pre-design, design, contract management, quality assurance and support, and maintenance.Jones named director of GSA's Design Excellence program. Casey Jones, a principal at jones¦kroloff, has been named the next director of the General Services Administration's Design Excellence program, according to sources at the GSA. Jones will replace Thomas Grooms, the program's current head. As director of Design Excellence, Jones will oversee the architect selection and design process for the GSA.

Related Stories

| Jul 16, 2012

Reed Construction hires new project manager

Fread is a LEED AP and received his degree from Purdue University.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

| Jul 12, 2012

New firm RSK Avanti Partners offers market development services

Full-service consulting firm is focused on working with product manufacturers, designers, specifies and contractors in the building construction market.

| Jul 12, 2012

Chicago Public Schools names Lend Lease team as construction manager

Under this Capital Improvement Program, the Lend Lease team will be responsible for renovation and life safety work at over 100 Chicago Public Schools across the City.

| Jul 12, 2012

Cramer joins Gilbane’s NYC Business Development Team

New Business Development Manager brings over 30 years of experience to Gilbane.

| Jul 12, 2012

Cardoso joins Margulies Perruzzi Architects

Senior architect brings experience, leadership to firm’s healthcare practice.

| Jul 12, 2012

EE&K and Knutson Construction selected for the Interchange in Minneapolis

Design-build contract for $79.3 million transportation hub will connect transit with culture.

| Jul 11, 2012

New BDC University course: Design Criteria for Ceramic Tile/Stone Installations

Everyone that successfully completed to course will receive 1.0 HSW/LU AIA LU.

| Jul 11, 2012

Perkins+Will designs new home for Gateway Community College

Largest one-time funded Connecticut state project and first designed to be LEED Gold.

| Jul 11, 2012

HOK honored with Los Angeles architectural award

42nd annual awards from the Los Angeles Business Council honor design excellence.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021