flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

News Briefs: Design firms say they need more project management training...  Jones named director of GSA's Design Excellence program... Carbon prices running out of gas in Northeast cap and trade market

News Briefs: Design firms say they need more project management training...  Jones named director of GSA's Design Excellence program... Carbon prices running out of gas in Northeast cap and trade market


August 11, 2010
This article first appeared in the 200908 issue of BD+C.

Design firms say they need more project management training. Nearly one-third (32%) of design and environmental firms report that project management training is their biggest training need, according to a survey in The Zweig HR Letter. Next in importance: marketing and business development training (19%) and leadership training (16%).Carbon prices running out of gas in Northeast cap and trade market. The price of carbon permits plummeted 8% for the Regional Greenhouse Gas Initiative (RGGI), which requires utilities in the Northeast to purchase carbon permits for each ton of carbon they emit. Lower demand for electricity as a result of the recession was the cause of the price plummet. More than 30 million permits (or allowances) had cleared at $3.23 each in a sale on June 17, 8% lower than the auction price in March.First green roof professionals certified. Green Roofs for Healthy Cities announced the first wave of accredited green roof professionals. These individuals have successfully completed a multidisciplinary exam encompassing five areas of concentration, including pre-design, design, contract management, quality assurance and support, and maintenance.Jones named director of GSA's Design Excellence program. Casey Jones, a principal at jones¦kroloff, has been named the next director of the General Services Administration's Design Excellence program, according to sources at the GSA. Jones will replace Thomas Grooms, the program's current head. As director of Design Excellence, Jones will oversee the architect selection and design process for the GSA.

Related Stories

Government Buildings | Mar 23, 2015

SOM leads planning for Egypt’s new $45 billion capital city

To alleviate overcrowding and congestion in Cairo, the Egyptian government is building a new capital from scratch.

BIM and Information Technology | Mar 23, 2015

Skanska hosts three-week 'hackathon' to find architect for Seattle tower development

Searching for a nimble, collaborative design firm for its 2&U tower project in Seattle, the construction giant ditches the traditional RFQ/RFP process for a hackathon-inspired competition.

Healthcare Facilities | Mar 23, 2015

Can advanced elevator technology take vertical hospitals to the next level?

VOA's Douglas King recalls the Odyssey project and ponders vertical transportation in high-rise healthcare design.

Healthcare Facilities | Mar 22, 2015

New Joplin, Mo., hospital built to tornado-resistant standards

The new hospital features a window and frame system that can protect patients from winds of up to 250 mph. 

Sports and Recreational Facilities | Mar 19, 2015

Populous design wins competition for UK's most sustainable arena

The live-concert venue will seat an audience of 12,000, which the firm says will be masked by “the atmosphere and intimacy of a 4,000-seat amphitheatre.” 

Architects | Mar 18, 2015

Architecture Billings Index rises in February

The ABI score was 50.4 last month, up slightly from a mark of 49.9 in January. This score reflects a minor increase in design services, according to AIA. 

Multifamily Housing | Mar 18, 2015

Prefabricated skycubes proposed with 'elastic' living apartments inside

The interiors for each unit are designed using an elastic living concept, where different spaces are created by sliding on tracks.

Architects | Mar 18, 2015

Boston selects finalists in resilient design competition

The competition asks for creative approaches for planning for a not-so-distant future Boston where higher sea levels and more frequent flooding will be real and critical issues to contend with.

Cultural Facilities | Mar 17, 2015

The High Line’s co-designer wins contract for The Underline in Miami

James Corner Field Operations will design the master plan for this 10-mile restoration project. 

Sponsored | | Mar 17, 2015

Are face-to-face meetings still important?

One CEO looks pass convenience and advocates for old school, in-person meetings.

boombox1
boombox2
native1

More In Category


Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.



Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021