flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Newer materials for green, resilient building complicate insurance underwriting

Newer materials for green, resilient building complicate insurance underwriting

Insurers can’t look to years of testing on emerging technology to assess risk.


By Peter Fabris, Contributing Editor | August 4, 2022
Sustainable materials
Courtesy Pexels.

New sustainable energy products using new and emerging technology make it difficult for insurance carriers to assess risk on green building projects.

Unlike on projects using standard materials, underwriters cannot look to many years of rigorous testing to see how products perform. This makes it hard to assess risk and offer policies on projects that use advanced features such as vegetative roofs, mass timber, or advanced solar panel technology.

New technology, materials, and construction methods can bring unforeseen risks, insurance executives say. Many green buildings have novel designs compared with those using conventional construction where much has been done the same way for years and the risks are well known.

Business interruptions caused by material damage in green building construction have generated costly and complex claims. These claims concern both the expense of replacing the damaged material and the amount of time it takes to replace it, especially given current supply chain difficulties.

Related Stories

| Mar 13, 2014

USGBC hits back at Environmental Policy Alliance criticism

The Washington, D.C.-based Environmental Policy Alliance has launched a campaign to make the claim that LEED-certified buildings are less energy efficient than other buildings. In response, USGBC told its members: "Don’t be fooled, the Environmental Policy Alliance isn’t the 'EPA' you might think."

| Mar 13, 2014

North Carolina board recommends switch to six-year code update cycle

In a nine to six vote, the North Carolina State Building Code Council on March 11 approved moving the commercial building code (except for the electrical code) to a six-year cycle for updating instead of a three-year cycle.

| Mar 13, 2014

OSHA’s funding disclosure requirement for those offering silica rule comments draws ire

The Occupational Safety and Health Administration is requiring those who submit comments on the silica rule to disclose their funding sources for their scientific research to avoid conflict of interest.

| Mar 13, 2014

EPA publishes ‘best management practices’ rule on erosion, stormwater at construction sites

The Environmental Protection Agency published a new rule this month that will require the construction, housing, and utility sectors to carry out "best management practices" in order to prevent erosion and harmful stormwater discharges at construction sites.

| Mar 5, 2014

San Francisco board seeks remedies to code enforcement complaints

Two supervisors charged that a lack of adequate code enforcement has led to blight from dilapidated or unfinished buildings. 

| Mar 5, 2014

Obama proposes $1 billion for climate change risk mitigation

President Barack Obama would spend $1 billion to “better understand the projected impacts of climate change,” encourage local action to reduce future risk, and fund technology and infrastructure that will be more resilient to climate change.

| Mar 5, 2014

Southern Forest Products Assn. revamps pressure-treated pine specifications

It provides information to assist with the proper specification and use of pressure-treated Southern Pine materials. 

| Mar 5, 2014

UL, PRI Construction Materials Technologies reach product certification agreement

Underwriters Laboratories (UL) Inc. reached an agreement with PRI Construction Materials Technologies LLC (PRI) through which PRI will participate in UL's "Data Acceptance Program," enabling the acceptance of data generated at PRI toward UL product certification.

| Mar 5, 2014

Quebec's building code doesn't meet needs of its aging population

The issue was raised in the wake of a tragic fire at a seniors' residence in L'Isle-Verte. 

| Mar 4, 2014

Massachusetts Congressional delegation asks FEMA to slow flood zone map requirements

After a recent successful challenge of the scientific methodology used to redraw the coastal high-hazard zones, the Massachusetts congressional delegation is asking federal officials to put the brakes on new flood zone maps for the Bay State.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021