flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Newark Liberty International Airport breaks ground on $2.4 billion redevelopment project

Airports

Newark Liberty International Airport breaks ground on $2.4 billion redevelopment project

The project includes a new 1 million-sf terminal building with 33 domestic aircraft gates.


By David Malone, Associate Editor | June 26, 2017

Rendering courtesy PGAL

The modernization project at the Newark Liberty International Airport is officially underway. The Port Authority of New York and New Jersey has recently broken ground on the $2.4 billion project.

The largest aspect of the project is the redevelopment of the original Terminal A building, which opened in 1973 and is being replaced with a new 1 million-sf terminal building. PGAL is the lead architect responsible for advanced planning and concept development for the structure.

Included in the new terminal are 33 domestic aircraft gates, expanded departures and arrivals curbside frontage, a parking garage complex, and infrastructure improvements. The terminal is designed to initially accommodate up to 13.6 million passengers each year, but is incorporating the flexibility necessary to expand to serve larger aircraft and increased passenger demand in the future.

 

Rendering courtesy PGAL.

 

An expandable security screening checkpoint will provide increased passenger queue space and dedicated lanes for premium passengers, crew, and physically challenged travelers. A new baggage claim area will include six claim units with immediate access to airline services offices and passenger amenities for two defined arrivals areas from the departures concourses. Hold room seating areas will comprise a broad range of retail and food and beverage options and airline lounges are immediately accessible after the security checkpoint.

Additionally, a new departures and arrivals roadway system will support Terminal A. The new 3,000-car parking garage complex will feature a pedestrian bridge and hub connection that links passengers from the garage and Air Train to the terminal.

 

Rendering courtesy PGAL.

 

The new Terminal A is expected to be fully operational in 2022.

Related Stories

Airports | Jul 26, 2021

NORR designs the UK’s first satellite launch Space Hub

The project will be located in Sutherland, Scotland.

Wood | Jul 16, 2021

The future of mass timber construction, with Swinerton's Timberlab

In this exclusive for HorizonTV, BD+C's John Caulfield sat down with three Timberlab leaders to discuss the launch of the firm and what factors will lead to greater mass timber demand.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Airports | Jun 9, 2021

ZGF unveils latest renderings of Portland International Airport’s main terminal

An undulating wooden roof highlights the project.

Airports | May 27, 2021

Grimshaw wins competition to design Shenzhen Airport East Integrated Transport Hub

The competition sought to find a design that created an integrated intermodal transport hub that could act as a new urban gateway.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Multifamily Housing | Mar 28, 2021

Smart home technology 101 for multifamily housing communities

Bulk-services Wi-Fi leads to better connectivity, products, and services to help multifamily developers create greater value for residents–and their own bottom line.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Airports | Jan 26, 2021

Security concerns will drive demand for airport technology over the next five years

A new report explores where and what spending for “smart” airports is likely to focus on.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


Airports

SOM unveils ‘branching’ structural design for new Satellite Concourse 1 at O’Hare Airport

The Chicago Department of Aviation has revealed the design for Satellite Concourse 1 at O’Hare International Airport, one of the nation’s business airports. Designed by Skidmore, Owings & Merrill (SOM), with Ross Barney Architects, Juan Gabriel Moreno Architects (JGMA), and Arup, the concourse will be the first new building in the Terminal Area Program, the largest concourse area expansion and revitalization in the airport’s almost seven-decade history. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021