flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York’s ‘Scaffold Law’ under fire for driving up project costs

Codes and Standards

New York’s ‘Scaffold Law’ under fire for driving up project costs

Lawmakers under pressure to reform law that makes contractors 100% liable for work-site injuries.


By Peter Fabris, Contributing Editor | December 20, 2018
Man on scaffolding

Courtesy Pixabay

New York State’s so-called “Scaffold Law,” which makes construction companies 100% liable for work-site injuries, is under heavy criticism for driving up the cost of construction projects.

Critics say the law will inflate the cost of the Gateway project, a new tunnel underneath the Hudson River for Amtrak and NJ Transit, by up to $300 million, according to a report in the New York Daily News. The law costs taxpayers at least $785 million annually and private businesses that work on public projects $1.49 billion per year, according to a study by SUNY Rockefeller Institute.

By consuming more tax dollars, the law has diminished the city’s ability to create more affordable housing, a housing advocate says. Insurance policies have become much tougher for contractors to obtain, a situation so dire that a coalition of builders on Long Island wants the state to declare “an insurance state of emergency.”

The president of the Building and Construction Trades Council of Greater New York says the law has been effective in preventing injuries and saving lives, and challenged critics to prove that the law has hurt companies’ finances.

Related Stories

Codes and Standards | Nov 30, 2018

Best solution to prevent California wildfire disasters: Stop building in places likely to burn

Approach would be unpopular as people attracted to stunning wooded landscapes.

Codes and Standards | Nov 29, 2018

USGBC and BRE form partnership

Two green standards groups will collaborate on standards, platforms, and research.

Codes and Standards | Nov 29, 2018

Parking garages in N.Y. State will have to be inspected every three years

Professional engineer must assess conditions.

Codes and Standards | Nov 28, 2018

To build water-efficient cities, water managers and urban planners must coordinate better

Lack of time and resources, and practitioners not in habit of working together hamper efforts.

Codes and Standards | Nov 26, 2018

All LEED-certified buildings eligible for LEED recertification

Projects must submit 12 months of data demonstrating continued or improved performance.

Codes and Standards | Nov 20, 2018

OSHA publishes updates to crane operator certification requirements

Long-delayed rules accept certifications by type or type and capacity.

Codes and Standards | Nov 19, 2018

Guide offers understanding of elements that create successful multi-floor communal spaces

CTBUH technical document analyzes how to approach tall urban habitat.

Codes and Standards | Nov 16, 2018

2018 International Green Construction Code released

Updated version helps governments streamline code development and adoption.

Codes and Standards | Nov 15, 2018

New versions of DOE’s EnergyPlus engine and the OpenStudio software development kit released

New offerings resolve over 70 bugs and offer new features.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021