flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York's first-ever public housing for visually-impaired begins upgrade

New York's first-ever public housing for visually-impaired begins upgrade

Many of the residents have lived in the building since it opened in 1980.


By Magnusson Architecture and Planning | June 10, 2014
Magnusson Architecture and Planning (MAP) and Associated Blind Housing Development Fund Corporation (Associated Blind HDFC) broke ground on a $38 million building upgrade at Selis Manor. Selis Manor is the first government-funded residence for the vision-impaired and disabled in New York City. Associated Blind HDFC manages the residence, which opened in 1980. The repairs and capital improvements are its first-ever building upgrades. The phased construction is set to be complete by 2016.
 
The 14-story building is located at 135 West 23rd Street in Manhattan. It has 205 studio, one-, and two-bedroom units. Amenities include a roof terrace, courtyard, bowling alley, fitness center, computer center, library, and auditorium.
 
The speakers at the ceremony were Brian Daniels, associate commissioner of the New York State Office of Children and Family Services: Commission for the Blind; Leroy Latiker III, underwriter-project manager of production and development at U.S. Department of Housing and Urban Development; Tony Saverese, Developer/Managing Agent at Associated Blind HDFC; Joyce Carrico, tenant association representative and resident at Selis Manor; E. Perry Winston, associate at Magnusson Architecture and Planning; and Joe Malewich, board member of Associated Blind HDFC.
 
All of the public spaces will be upgraded and a new entrance will be added. Each of the apartments will have new fixtures and finishes. The separate kitchens will be connected directly to the living areas of the residential units for better flow and circulation. The renovation includes a full MEP systems upgrade that will lower energy usage.
 
“This long-awaited renovation will improve the safety and quality of housing for Selis Manor’s residents,” said Tony Savarese, Developer/Managing Agent at Associated Blind HDFC. “It is always a challenge to renovate an occupied building, and it is even more complicated when the occupants are visually-impaired. We worked closely with MAP on a plan that will ensure the safety of all residents during construction.”
 
Residents are supported by U.S. Department of Housing and Urban Development (HUD)’s Housing Choice Voucher Program, also known as Section 8. Associated Blind HDFC will arrange for temporary living spaces for every tenant on a rotating basis. The phased construction will take place two floors at a time.
 
 

Touchable models

Many of the residents have lived in the building since it opened. During the design phase of the project, MAP created touchable models of the new apartment layouts. The models acted as three-dimensional aides that helped the visually-impaired residents understand the changes by touch. Using the models as a guide, MAP’s architects engaged the residents in the process. They also incorporated the residents’ suggestions into the renovations.
 
 
“MAP has designed all types of housing, ranging from market-rate to affordable, and everything in between,” said Magnus Magnusson, AIA, LEED AP, founding principal of MAP. “So we know how to address the unique needs of particular residents. Selis Manor is over 30 years old, and long overdue for an upgrade. When the renovation is complete, all residents will have high-quality amenities and a superior standard of living – the kind of housing that all New Yorkers need and deserve.”
 
 

Fewer hurdles

MAP’s design eases crowding, increases security, and separates residents and visitors. Currently, the one entrance is shared by 250 residents and the patrons of VISIONS, a not-for-profit that provides services, including meals and classes, for over 500 people each day.  This traffic causes congestion in the common areas of the ground floor. A new residents-only entrance will be protected with an electronic pass system. The other entrance will be for VISIONS patrons.
 
Scored terrazzo flooring will help residents navigate within the building. A path along the floor will guide residents toward elevators and indicate stair landings. A new guardrail along the south façade of the building facing 23rd Street will include Braille inserts describing the history of the residence that lead toward the entrance. MAP consulted with Chris Downey, a San Francisco-based architect who became blind at the age of 45.
 
The architects expect NYSERDA Multi-family Participation Program (MPP) certification for the project. EME Group provided MEP engineering and Nash Associates provided structural engineering. Rockport Mortgage Corp. and Forsyth Street Advisors helped secure financing for the project.
 
 
 
 
 
 

Related Stories

| May 16, 2013

Chicago unveils $1.1 billion plan for DePaul arena, Navy Pier upgrades

Hoping to send a loud message that Chicago is serious about luring tourism and entertainment spending, Mayor Rahm Emanuel has released details of two initiatives that have been developing for more than a year and that it says will mean $1.1 billion in investment in the McCormick Place and Navy Pier areas.

| May 16, 2013

Michael R. Bohn named Executive VP at Gilbane

Gilbane has promoted Michael R. Bohn to executive vice president. With over 28 years of service to the company and leadership roles on such high-profile projects as the University of Michigan Biomedical Science Building and the University of Chicago Medical Center, Bohn will now have responsibility for Gilbane’s New York and Midwest business units.

| May 15, 2013

Schneider Electric announces Global Xperience Efficiency Events for 2013

Schneider Electric’s Xperience Efficiency series will begin with events in the United States, China, Colombia, Brazil and Russia.

| May 15, 2013

Center for Green Schools, Architecture for Humanity release new tool for green schools

The 70-page guide demystifies the processes of identifying building improvement opportunities and finance and implementation strategies.

| May 14, 2013

Paints and coatings: The latest trends in sustainability

When it comes to durability, a 50-year building design ideally should include 50-year coatings. Many building products consume substantial amounts of energy, water, and petrochemicals during manufacture, but they can make up for it in the operations phase. The same should be expected from architectural coatings.

| May 14, 2013

Advanced turbines generate 6X more energy than conventional models

US-based wind energy company SheerWind just unveiled the INVELOX – a tunnel-based wind turbine that can produce up to 600% more power than traditional wind turbines.

| May 14, 2013

Raymond Clark joins HOK’s Chicago Practice as Management Principal

HOK announced today that Raymond Clark, AIA, LEED AP, has joined its leadership team in Chicago as senior vice president and management principal.

| May 14, 2013

Easy net-zero energy buildings [infographic]

"Be a Zero Hero" infographic educates building industry professionals on ultra energy-efficient structural insulated panel construction

| May 9, 2013

10 high-efficiency plumbing fixtures

From a "no sweat" toilet to a deep-well lavatory, here's a round up of the latest high-efficiency plumbing fixtures.

boombox1
boombox2
native1

More In Category




Codes and Standards

New FEMA rules include climate change impacts

FEMA’s new rules governing rebuilding after disasters will take into account the impacts of climate change on future flood risk. For decades, the agency has followed a 100-year floodplain standard—an area that has a 1% chance of flooding in a given year.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021