flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York's first-ever public housing for visually-impaired begins upgrade

New York's first-ever public housing for visually-impaired begins upgrade

Many of the residents have lived in the building since it opened in 1980.


By Magnusson Architecture and Planning | June 10, 2014
Magnusson Architecture and Planning (MAP) and Associated Blind Housing Development Fund Corporation (Associated Blind HDFC) broke ground on a $38 million building upgrade at Selis Manor. Selis Manor is the first government-funded residence for the vision-impaired and disabled in New York City. Associated Blind HDFC manages the residence, which opened in 1980. The repairs and capital improvements are its first-ever building upgrades. The phased construction is set to be complete by 2016.
 
The 14-story building is located at 135 West 23rd Street in Manhattan. It has 205 studio, one-, and two-bedroom units. Amenities include a roof terrace, courtyard, bowling alley, fitness center, computer center, library, and auditorium.
 
The speakers at the ceremony were Brian Daniels, associate commissioner of the New York State Office of Children and Family Services: Commission for the Blind; Leroy Latiker III, underwriter-project manager of production and development at U.S. Department of Housing and Urban Development; Tony Saverese, Developer/Managing Agent at Associated Blind HDFC; Joyce Carrico, tenant association representative and resident at Selis Manor; E. Perry Winston, associate at Magnusson Architecture and Planning; and Joe Malewich, board member of Associated Blind HDFC.
 
All of the public spaces will be upgraded and a new entrance will be added. Each of the apartments will have new fixtures and finishes. The separate kitchens will be connected directly to the living areas of the residential units for better flow and circulation. The renovation includes a full MEP systems upgrade that will lower energy usage.
 
“This long-awaited renovation will improve the safety and quality of housing for Selis Manor’s residents,” said Tony Savarese, Developer/Managing Agent at Associated Blind HDFC. “It is always a challenge to renovate an occupied building, and it is even more complicated when the occupants are visually-impaired. We worked closely with MAP on a plan that will ensure the safety of all residents during construction.”
 
Residents are supported by U.S. Department of Housing and Urban Development (HUD)’s Housing Choice Voucher Program, also known as Section 8. Associated Blind HDFC will arrange for temporary living spaces for every tenant on a rotating basis. The phased construction will take place two floors at a time.
 
 

Touchable models

Many of the residents have lived in the building since it opened. During the design phase of the project, MAP created touchable models of the new apartment layouts. The models acted as three-dimensional aides that helped the visually-impaired residents understand the changes by touch. Using the models as a guide, MAP’s architects engaged the residents in the process. They also incorporated the residents’ suggestions into the renovations.
 
 
“MAP has designed all types of housing, ranging from market-rate to affordable, and everything in between,” said Magnus Magnusson, AIA, LEED AP, founding principal of MAP. “So we know how to address the unique needs of particular residents. Selis Manor is over 30 years old, and long overdue for an upgrade. When the renovation is complete, all residents will have high-quality amenities and a superior standard of living – the kind of housing that all New Yorkers need and deserve.”
 
 

Fewer hurdles

MAP’s design eases crowding, increases security, and separates residents and visitors. Currently, the one entrance is shared by 250 residents and the patrons of VISIONS, a not-for-profit that provides services, including meals and classes, for over 500 people each day.  This traffic causes congestion in the common areas of the ground floor. A new residents-only entrance will be protected with an electronic pass system. The other entrance will be for VISIONS patrons.
 
Scored terrazzo flooring will help residents navigate within the building. A path along the floor will guide residents toward elevators and indicate stair landings. A new guardrail along the south façade of the building facing 23rd Street will include Braille inserts describing the history of the residence that lead toward the entrance. MAP consulted with Chris Downey, a San Francisco-based architect who became blind at the age of 45.
 
The architects expect NYSERDA Multi-family Participation Program (MPP) certification for the project. EME Group provided MEP engineering and Nash Associates provided structural engineering. Rockport Mortgage Corp. and Forsyth Street Advisors helped secure financing for the project.
 
 
 
 
 
 

Related Stories

Healthcare Facilities | Mar 22, 2015

New Joplin, Mo., hospital built to tornado-resistant standards

The new hospital features a window and frame system that can protect patients from winds of up to 250 mph. 

Sports and Recreational Facilities | Mar 19, 2015

Populous design wins competition for UK's most sustainable arena

The live-concert venue will seat an audience of 12,000, which the firm says will be masked by “the atmosphere and intimacy of a 4,000-seat amphitheatre.” 

Architects | Mar 18, 2015

Architecture Billings Index rises in February

The ABI score was 50.4 last month, up slightly from a mark of 49.9 in January. This score reflects a minor increase in design services, according to AIA. 

Multifamily Housing | Mar 18, 2015

Prefabricated skycubes proposed with 'elastic' living apartments inside

The interiors for each unit are designed using an elastic living concept, where different spaces are created by sliding on tracks.

Architects | Mar 18, 2015

Boston selects finalists in resilient design competition

The competition asks for creative approaches for planning for a not-so-distant future Boston where higher sea levels and more frequent flooding will be real and critical issues to contend with.

Cultural Facilities | Mar 17, 2015

The High Line’s co-designer wins contract for The Underline in Miami

James Corner Field Operations will design the master plan for this 10-mile restoration project. 

Sponsored | | Mar 17, 2015

Are face-to-face meetings still important?

One CEO looks pass convenience and advocates for old school, in-person meetings.

High-rise Construction | Mar 16, 2015

NBBJ creates 'shadowless' skyscraper concept for proposed UK development

A team of architects from the London branch of NBBJ used computer algorithms to generate a dual-tower design that maximizes sunlight reflections to eliminate the buildings' shadows. 

Healthcare Facilities | Mar 16, 2015

Healthcare planning in a post-ACA world: 3 strategies for success

Healthcare providers are seeking direction on how to plan for a value-based world while still very much operating in a volume-based market. CBRE Healthcare's Curtis Skolnick offers helpful strategies. 

Resort Design | Mar 16, 2015

Giancarlo Zema Design Group unveils plans for semi-submerged resort in Qatar

The resort will have four semi-submerged hotels that look similar to super-yachts, each including 75 luxury suites with private terraces.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021