The New York Public Library has decided to scrap its drastic renovation plans, which involved remodeling the Stephen A. Schwarzman building, one of its research libraries, and selling the home of its mid-Manhattan Library.
The new plan calls for a less drastic renovation of the Schwarzman building, and keeping the mid-Manhattan branch open.
The original plan would have involved moving the stacks from the Schwarzman building to a storage facility in New Jersey, leaving plenty of space for Norman Foster to create a four-level atrium housing a circulating library, a cafe, and computers.
According to Hyperallergic, critics of this idea voiced concerns about its impact on the library as a research institution. Protests were held, and three lawsuits were filed in order to stop the renovation. In the end, the Library decided to change its plans for multiple reasons, according to the New York Times.
"Various factors contributed to the library’s decision, several trustees said: a study that showed the cost of renovating the main building to be more than expected (the project had originally been estimated at about $300 million); the change in city government; and input from the public," the New York Times reports.
Half the public space will be opened up in the Schwarzman building, according to the revised solution, including new spaces for youth and research/writing areas. In addition, the mid-Manhattan branch will undergo extensive remodeling in stages, so that it can be left open during construction.
One thing that remains in the Library's plans is the closing of the science library.
Related Stories
Museums | Mar 3, 2016
How museums engage visitors in a digital age
Digital technologies are opening up new dimensions of the museum experience and turning passive audiences into active content generators, as Gensler's Marina Bianchi examines.
Cultural Facilities | Mar 1, 2016
China bans ‘weird’ public architecture, gated communities
Directs designers of public buildings to focus on functionality.
Contractors | Feb 25, 2016
Huntsville’s Botanical Garden starts work on new Guest Welcome Center
The 30,000-sf facility will feature three rental spaces of varying sizes.
The High Line | Feb 24, 2016
The last unused portion of the High Line is set to become a piazza
The piazza replaces an earlier design for the space that called for a bowl-shaped garden.
Museums | Feb 12, 2016
Construction begins on Foster + Partners’ Norton Museum of Art expansion project
The Florida museum is adding gallery space, an auditorium, great hall, and a 20,000-sf garden.
Game Changers | Feb 4, 2016
GAME CHANGERS: 6 projects that rewrite the rules of commercial design and construction
BD+C’s inaugural Game Changers report highlights today’s pacesetting projects, from a prefab high-rise in China to a breakthrough research lab in the Midwest.
Cultural Facilities | Jan 28, 2016
FIRST LOOK: Pikes Peak visitor complex will appear carved into the mountainside, at 14,115 feet
The minimalist structure will provide majestic views of the Rocky Mountains for the 600,000-plus people who visit the summit each year.
Architects | Jan 28, 2016
25-year-old architect wins competition for World War I memorial in Pershing Park
Joe Weishaar and sculptor Sabin Howard were selected from among five finalists and over 350 entries overall.
Architects | Jan 15, 2016
Best in Architecture: 18 projects named AIA Institute Honor Award winners
Morphosis' Perot Museum and Studio Gang's WMS Boathouse are among the projects to win AIA's highest honor for architecture.
| Jan 14, 2016
How to succeed with EIFS: exterior insulation and finish systems
This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.