flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York office revamp by Kohn Pedersen Fox features new façade raising occupant comfort, reducing energy use

Office Buildings

New York office revamp by Kohn Pedersen Fox features new façade raising occupant comfort, reducing energy use

A new skin on the mid-century 666 Fifth Avenue building is composed of some of the largest façade panels installed in the city.


By Peter Fabris, Contributing Editor | September 14, 2023
Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF

The modernization of a mid-century Midtown Manhattan office tower features a new façade intended to improve occupant comfort and reduce energy consumption. The building, at 666 Fifth Avenue, was originally designed by Carson & Lundin.

First opened in November 1957 when it was considered cutting-edge, the original façade of the 500-foot-tall modernist skyscraper was highly inefficient by today’s energy efficiency standards. Using an early version of a semi-unitized curtain wall, the old façade featured units with punched aluminum panels on the bottom and a single glass pane on top. This was advantageous in its light weight, but yielded poor energy efficiency. The project team chose a full reskinning as the best option to upgrade the aging building.

The new façade features the largest single-pane units ever used on an office development in New York City, according to a blog post at KPF.com. These large panes created efficiencies in construction, logistics, and structural detailing. Panel fabricators used a single cut, yielding only minimal waste when producing each unit. Situated inside a four-sided shadowbox, the panels span the full width between columns and the full height between floors. This approach tripled the window area, bringing in plentiful daylight for tenants.

Other improvements on the 1.2 million-sf office tower include:

  • Mechanical upgrades for high-efficiency heating and air systems that draw in greater quantities of fresh air. 
  • A reconstructed lobby with modernized elevators that will support a retail space. 
  • Numerous columns and low ceilings were eliminated from office floors to maximize interior space. 
  • Some units offer double-height spaces and interconnected floors, taking advantage of the building’s wide range of floor plate sizes. 
  • Designers used existing massing—a podium and tower interspersed with multiple setbacks—to create exterior terraces at multiple levels on three sides.

“One of the important aspects of an adaptive reuse project is finding the existing value in a building, and identifying areas that can create more desirable space for users," said KPF Principal Lauren Schmidt, AIA, LEED AP BD+C. "The existing façade at 660 Fifth Avenue was one of the first curtain wall systems when it was built in the 1950s and very modern at the time, but it had limitations in terms of thermal and acoustical insulation, as well as small windows. We approached the façade as a clean slate and proposed opening it up completely with units that would span column to column. This, in a sense, allowed the columns to disappear and create open views. It was a great opportunity to propose something that was perhaps considered atypical, but actually, as we worked through the logistics of it, made sense for a number of reasons and was highly efficient.”

On the team: 
Client: Brookfield Properties
Design Architect (full services): Kohn Pedersen Fox (KPF)
MEP Engineer: Cosentini Associates
Structural Engineer: Gilsanz Murray Steficek (GMS)
General contractor: Turner Construction

660 Fifth Avenue, NY Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue, NY Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue, NY Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue, NYC. Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue, NYC. Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue, NYC. Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue, NYC. Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue, NYC. Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue, NYC. Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue, NYC. Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue, NYC. Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue, NYC. Photo: Raimund Koch, courtesy KPF
Photo: Raimund Koch, courtesy KPF
29_Before 666 Fifth Avenue_Credit Hayes Davidson Courtesy KPF.jpg
Before image. Photo: Hayes Davidson, courtesy KPF
660 Fifth Avenue_Credit Raimund Koch Courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue_Credit Raimund Koch Courtesy KPF
Photo courtesy KPF
660 Fifth Avenue_Credit Raimund Koch Courtesy KPF
Photo: Raimund Koch, courtesy KPF
660 Fifth Avenue_Credit Raimund Koch Courtesy KPF
Photo: Raimund Koch, courtesy KPF

Related Stories

Daylighting | Aug 18, 2022

Lisa Heschong on 'Thermal and Visual Delight in Architecture'

Lisa Heschong, FIES, discusses her books, "Thermal Delight in Architecture" and "Visual Delight in Architecture," with BD+C's Rob Cassidy. 

| Aug 17, 2022

IBM’s former office buildings in Boca Raton turn into a modern tech campus

Built in 1968, the Boca Raton Innovation Campus (BRiC), at 1.7 million square feet, is the largest office campus in Florida.

| Aug 9, 2022

Work-from-home trend could result in $500 billion of lost value in office real estate

Researchers find major changes in lease revenues, office occupancy, lease renewal rates.

Codes and Standards | Jul 22, 2022

Office developers aim for zero carbon without offsets

As companies reassess their office needs in the wake of the pandemic, a new arms race to deliver net zero carbon space without the need for offsets is taking place in London, according to a recent Bloomberg report.

Office Buildings | Jul 19, 2022

Austin adaptive reuse project transforms warehouse site into indoor-outdoor creative office building

Fifth and Tillery, an adaptive reuse project, has revitalized a post-industrial site in East Austin, Texas.

Office Buildings | Jul 12, 2022

Miami office tower nears completion, topping off at 55 stories

In Miami, construction of OKO Group and Cain International’s 830 Brickell office tower is nearing completion.

AEC Business Innovation | Jun 15, 2022

Cognitive health takes center stage in the AEC industry

Two prominent architecture firms are looking to build on the industry’s knowledge base on design’s impact on building occupant health and performance with new research efforts.

Sustainable Design and Construction | Jun 14, 2022

For its new office, a farm in California considers four sustainable design options, driven by data

The architect used cove.tool’s performance measurement software to make its case.

Office Buildings | Jun 13, 2022

San Antonio’s electric utility HQ to transform into a modern office building

In San Antonio, Tex., the former headquarters of CPS Energy, the city’s electric utility, is slated to transform into 100,000 square feet of office and retail space on San Antonio’s famed River Walk.

Office Buildings | Jun 8, 2022

Former L.A. Times newsroom/printing plant remade into office campus

Phase 1 of The Press, an adaptive reuse project that is converting an old Los Angeles Times facility into a modern office campus, was recently completed in Costa Mesa, Calif.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021