flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York making slow progress on resiliency seven years after Hurricane Sandy

Codes and Standards

New York making slow progress on resiliency seven years after Hurricane Sandy

Property owners face many challenges; coastal defense project plans are complex and need more time to plan.


By Peter Fabris, Contributing Editor | July 24, 2019

Courtesy Pixabay

It’s been seven years since Hurricane Sandy caused extensive flooding in the New York metro region, and progress on resiliency since then has been slow.

One city planning study called “Resilient Neighborhoods” has focused on communities facing unique risks for coastal flooding. This program produced recommendations to harden these neighborhoods in the Bronx in the spring of 2017. It could be the basis of a more extensive initiative to boost resiliency in New York.

But the city has much more to do to defend itself from another storm of Sandy’s magnitude, with individual property owners facing difficult challenges and concepts for regional coastal defense needing more time to plan and implement due to their considerable complexity. Some code changes, such as one that permits a slight increase in building height to create storage lofts to replace basement space vulnerable to flooding, have been enacted. It will take time for owners to take advantage of this option, though.

Residents of a large co-op development, Edgewater Park, have been slow to make renovations after co-op bylaws and city zoning rules were amended to allow structures to be elevated.

Related Stories

| Dec 15, 2011

NRDC charges Maine governor with weakening green wood requirement

The FSC program is administered through the Leadership in Energy and Environmental Design (LEED) and requires wood to be harvested in a sustainable way.

| Dec 15, 2011

Post-tornado, Tuscaloosa seeks to create walkable urban, retail areas

Block sizes initially were limited to a maximum perimeter of 1,750 feet, with no side of the block being longer than 500 feet.

| Dec 15, 2011

Allentown, Pa. city council asked to repeal union-friendly law

The mayor of Allentown, Pa. asked the City Council to repeal a year-old ordinance that forces contractors to hire union workers for large city projects funded with state and federal dollars.

| Dec 13, 2011

LEED-EB outpaces LEED for new construction

The U.S. Green Building Council's (USGBC's) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.

| Dec 13, 2011

Regulators charge pervasive abuse of construction workers in Connecticut

Federal and state regulators say they have uncovered what they call "widespread noncompliance" with minimum wage and overtime laws in Connecticut's construction industry.

| Dec 13, 2011

Philadelphia mayor signs order for project labor agreements

Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.

| Dec 13, 2011

Improved code requirements for attic ventilation

The Roof Assembly Ventilation Coalition (RAVC) participated in the development of the code.

| Dec 12, 2011

LEED-EB Outpaces LEED for New Construction

The U.S. Green Building Council’s (USGBC’s) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.

| Dec 12, 2011

Philadelphia Mayor Signs Order for Project Labor Agreements

Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.

| Dec 12, 2011

Improved Code Requirements for Attic Ventilation

The International Code Council (ICC) recently published the 2012 International Residential Code (IRC) that includes improved code requirements for balanced intake and exhaust for ventilated attics.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021