flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York making slow progress on resiliency seven years after Hurricane Sandy

Codes and Standards

New York making slow progress on resiliency seven years after Hurricane Sandy

Property owners face many challenges; coastal defense project plans are complex and need more time to plan.


By Peter Fabris, Contributing Editor | July 24, 2019

Courtesy Pixabay

It’s been seven years since Hurricane Sandy caused extensive flooding in the New York metro region, and progress on resiliency since then has been slow.

One city planning study called “Resilient Neighborhoods” has focused on communities facing unique risks for coastal flooding. This program produced recommendations to harden these neighborhoods in the Bronx in the spring of 2017. It could be the basis of a more extensive initiative to boost resiliency in New York.

But the city has much more to do to defend itself from another storm of Sandy’s magnitude, with individual property owners facing difficult challenges and concepts for regional coastal defense needing more time to plan and implement due to their considerable complexity. Some code changes, such as one that permits a slight increase in building height to create storage lofts to replace basement space vulnerable to flooding, have been enacted. It will take time for owners to take advantage of this option, though.

Residents of a large co-op development, Edgewater Park, have been slow to make renovations after co-op bylaws and city zoning rules were amended to allow structures to be elevated.

Related Stories

| Sep 11, 2013

White paper examines Joint Commission requirements for NFPA codes in healthcare

The healthcare industry has experienced great attention from The Joint Commission concerning fire and life safety issues.

| Sep 11, 2013

San Francisco expected to drop firefighter air tank refilling station rule for skyscrapers

San Francisco is poised to drop a requirement that skyscrapers have refill stations so firefighters can recharge their air tanks during a blaze. The city has required that new high-rises have the air refill systems for about ten years. 

| Sep 5, 2013

State legislatures continue to raise the bar on green school construction

Since the beginning of 2013, the USGBC has followed more than 125 bills across 34 states that seek to advance healthy, high-performing schools.

| Sep 5, 2013

Construction industry groups create coalition to respond to new OSHA silica rule

A group of 11 construction trade associations has created the Construction Industry Safety Coalition in response to the Occupational Safety and Health Administration’s (OSHA) proposed rule on silica for the construction industry.

| Sep 5, 2013

Red tape delays California county jail construction projects

California authorized $1.2 billion for jail construction in 2007, but not a single county in the state has completed a jail project since then.

| Sep 5, 2013

New CM-at-risk and design-build options create controversy in Ohio

Some contractors say Ohio's new system puts small and midsize construction companies at a disadvantage.

| Sep 5, 2013

Outdated codes slowed disaster recovery in Tuscaloosa, Ala.

Outdated building codes and lack of a master plan slowed the initial rebuilding stage after a devastating tornado leveled parts of Tuscaloosa, Ala. in 2011, according to the city’s mayor.

| Aug 28, 2013

Building collapse prompts legislation to beef up demolition regulations in Philadelphia

Philadelphia City Council will introduce legislation next month to strengthen the regulation of building demolition practices.

| Aug 28, 2013

Rules requiring contractors to boost hiring of veterans criticized

Some businesses are pushing back against proposed rules requiring federal contractors to step up their hiring of returning military service personnel.

| Aug 28, 2013

OSHA moves to reduced exposure to crystalline silica

Under a proposal from the Occupational Safety and Health Administration, the new permissible exposure limit to crystalline silica per cubic meter of air could be changed from 250 micrograms to 50 micrograms.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021