flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York governor makes emergency design-build authorization

Codes and Standards

New York governor makes emergency design-build authorization

The declaration was issued in response to Winter Storm Jonas which dumped over 18 inches of snow in parts of the state.


By Peter Fabris, Contributing Editor | February 11, 2016
New York governor makes emergency design-build authorization

New York City during Winter Storm Jonas. Photo: Jeff Kern/Creative Commons

New York Governor Andrew Cuomo included emergency design-build authorization as a part of his State of Emergency Declaration for the Commissioner of Transportation and the Commissioner of General Services. 

The declaration was issued in response to Winter Storm Jonas which dumped over 18 inches of snow in parts of the state. The action allows, “the Commissioner of Transportation or the Commissioner of General Services to award design-build and best value contracts without following the proscribed procurement process.”

The Design-Build Institute of America said in a press release, “Over the years, design-build has proven itself particularly capable of handling disaster recovery efforts. Used in the rebuilding after Super Storm Sandy, this is not the first time the state of New York relied on design-build to help the state quickly rebound from a natural disaster. 

“Also playing a large role in rebuilding Louisiana after Hurricane Katrina, design-build and its single point of contact for design and construction forgoes many of the inefficiencies of traditional project delivery that are unworkable during an emergency situation."

Related Stories

| Apr 5, 2012

New IgCC green building code is a ‘game changer,’ AIA official says

An AIA official calls the new International Green Construction Code (IgCC) a “game changer” for sustainable construction.

| Apr 5, 2012

Model energy codes add thousands to cost of new apartment construction, study says

New energy codes could add thousands of dollars to the construction costs of each individual apartment residence in a multifamily building, according to new research commissioned by the National Multi-Housing Council and the National Apartment Association.

| Apr 5, 2012

LEED 2012 will include new requirements for data centers

The U.S. Green Building Council’s updated LEED 2012 standards will require two systems to be modeled for each project in order to show power utilization effectiveness.

| Mar 30, 2012

CSI webinar: Durable & energy efficient building envelope design, April 24

This seminar will review recent changes in North America energy codes, examples of building enclosure wall assemblies being considered for code compliance, potential moisture management and durability challenges, and design tools that could be used to assess and minimize potential problems.

| Mar 30, 2012

Improved construction that followed seismic codes helped avert loss of life in Mexico temblor

A magnitude-7.4 earthquake that shook Mexico from Mexico City to Acapulco damaged hundreds of homes and sent thousands fleeing from swaying office buildings, yet no one was killed, according to early reports.

| Mar 30, 2012

Chicago may allow people to live in retail spaces

The Chicago City Council’s Zoning Committee approved a zoning change that will allow up to 50% of work space in low-intensity business districts to be used for living space.

| Mar 30, 2012

LEED growing fast in the housing rental market

Last year, developers of 23,000 U.S. multifamily housing units applied for LEED certification.

| Mar 30, 2012

Forest Stewardship Council critical of proposed LEED 2012 changes

According to the Forest Stewardship Council (FSC), the third draft of LEED 2012, if approved as written, would represent a step backward from the current Certified Wood Credit.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021