New York City’s ban on nonessential construction has been strengthened and the city’s Department of Buildings has stepped up enforcement.
The department issued more than 100 violations and stop-work orders for noncompliance with the construction ban as of April 2. For the most part, though, compliance has been the rule. More than 99% of nonessential construction sites have shut down or are in the process of doing so, the department says.
The only types of work allowed are emergency construction, work on essential facilities, and projects that require only one on-site worker. Emergency work includes projects that will help protect the health and safety of a building’s occupants, as well as restoration of heat, hot water, or power.
Work can continue on projects that would be unsafe if construction stopped. Essential facilities include roads, bridges, and transit infrastructure; utilities; health care facilities; transitional housing and homeless shelters; and affordable housing.
Related Stories
Codes and Standards | May 17, 2019
NIMBYism is the biggest multifamily construction barrier
National Apartment Assn. report assesses reasons for difficulty in creating more apartments.
Codes and Standards | May 17, 2019
Dept. of Energy to award up to $33.5 million for advanced construction R&D
Focus is on techniques to reduce energy bills.
Codes and Standards | May 16, 2019
Mixed reviews on targeted tax break for San Francisco neighborhood
“Twitter tax break” may have worsened some of the area’s problems.
Codes and Standards | May 15, 2019
OSHA inspections to increase, says Secretary of Labor
Newly hired inspectors getting up to speed.
Codes and Standards | May 14, 2019
Database records more than 1,360 K-12 school shooting incidents since 1970
Naval Postgraduate School program maps locations nationwide.
Codes and Standards | May 13, 2019
In many cities, downtown housing comes with a hefty premium
Urban core living costs hundreds of thousands more in largest U.S. cities.
Codes and Standards | May 7, 2019
San Francisco plan would require largest commercial buildings to use 100% renewable electricity
First in the U.S. mandate would be phased in from 2022 to 2030.
Codes and Standards | May 7, 2019
ABC says best practices can improve construction companies’ safety by 680%
Daily ‘toolbox safety talks’ were most effective safety measures.
Codes and Standards | May 7, 2019
Office noise significantly reducing employee concentration, productivity, and creativity
Workplace distractions cause some to choose to work remotely.
Codes and Standards | May 7, 2019
WSP USA says it will be carbon neutral in 2019
Engineering firm will offset carbon at all offices and with employee business travel.