flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York City tightens restrictions on construction during pandemic

Codes and Standards

New York City tightens restrictions on construction during pandemic

Dept. of Buildings has issued more than 100 violations and stop-work orders.


April 29, 2020

Courtesy Pixabay

New York City’s ban on nonessential construction has been strengthened and the city’s Department of Buildings has stepped up enforcement.

The department issued more than 100 violations and stop-work orders for noncompliance with the construction ban as of April 2. For the most part, though, compliance has been the rule. More than 99% of nonessential construction sites have shut down or are in the process of doing so, the department says.

The only types of work allowed are emergency construction, work on essential facilities, and projects that require only one on-site worker. Emergency work includes projects that will help protect the health and safety of a building’s occupants, as well as restoration of heat, hot water, or power.

Work can continue on projects that would be unsafe if construction stopped. Essential facilities include roads, bridges, and transit infrastructure; utilities; health care facilities; transitional housing and homeless shelters; and affordable housing.

Related Stories

| Dec 29, 2011

Decision not to fireproof the new World Trade Center Transportation Hub criticized

Some criticized the decision, reasoning that the structure could be a terrorist target.

| Dec 29, 2011

Seismic safety in question at thousands of California public schools

California regulators responsible for enforcing earthquake safety laws have failed to certify more than 16,000 construction projects in California public schools, increasing the risk that some projects may be unsafe, according to a state audit report.

| Dec 29, 2011

GreenWizard offers cloud-based LEED credit management, assessment

The company recently began offering companies the ability to run assessments for design credits, in addition to traditional product-specific LEED credits.

| Dec 22, 2011

Federal home weatherization program has impacted 6.8 million homes

More than 6.8 million homes have been weatherized using federal, state, utility, and other funds under the American Recovery and Reinvestment Act.

| Dec 22, 2011

Group developing BIM data standards

A collaboration among Georgia Tech’s Digital Building Lab, the Precast Concrete Institute, the American Concrete Institute, and the American Institute of Steel Construction aims to develop global standards for transportation of three-dimensional digital models among fabricator, architecture, engineering, and construction groups.

| Dec 22, 2011

New green code spells out thermal requirement for roof retrofits

The 2012 International Green Construction Code (IgCC) includes a straightforward approach to minimum thermal requirements for roof and wall systems.

| Dec 22, 2011

AGC’s safety conference Jan. 11-13 in San Antonio

The Associated General Contractors of America’s national meeting for safety and health professionals will take place Jan. 11-13, 2012 in San Antonio, TX.

| Dec 22, 2011

Proposed New York City zoning revamp encourages rooftop solar and wind energy

New zoning regulation proposals to make it easier for building owners in New York City to make their structures more sustainable have entered the public approval process.

| Dec 15, 2011

Dayton, Ohio schools saving $2.6 million annually by building to LEED

On average, green schools save about $100,000 a year on operating costs, including energy and water savings.

| Dec 15, 2011

Building to LEED standards can pose new risks for construction workers

Workers on these projects suffer a 24% increase in falls to lower levels during roof work, which researchers attributed to the installation of solar panels, and a few other risks.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021