flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York City passes overhaul of construction codes

Codes and Standards

New York City passes overhaul of construction codes

Over 600 major changes along with thousands of smaller updates slated for 2022.


By Peter Fabris, Contributing Editor | October 20, 2021
New York City

Courtesy Pixabay

New York City recently made over 600 major updates and thousands of smaller changes to its construction codes—the first such wholesale revamping since 2014.  

The changes are “intended to improve safety for New Yorkers, and incorporate the latest in building technologies,” according to a statement from the city. “The new codes use the highest international standards for the design, construction, and maintenance of buildings as a baseline, while continuing our city’s proud tradition of implementing additional enhancements to ensure we have among the strongest building regulations anywhere in the world.”

Revisions include:

· Increased material choices available to builders by expanding the use of sustainable building materials such as cross-laminated timber and structural composite lumber.

· Expansion of the applicability of flood zone requirements of the 100-year flood hazard area to all critical facilities (including fire, rescue, ambulance, police stations, and designated emergency shelters) located in the 500-year flood zone.

· Policies to support the use of alternative energy production processes including hydrogen fuel cells.

· Clear compliance criteria for elevator systems to ensure greater accessibility and usability for building occupants with physical and intellectual/developmental disabilities.

· Reduction of the required 8-foot basement clearance height for two-family homes to 7 feet to increase affordable housing opportunities.

· Permission to use netting, low barriers, and chain link fencing in lieu of solid fencing that creates blind tunnels for pedestrians.

· Creation of a new license type for advanced crane technology, such as articulating boom cranes and roto-telehandlers.

The updated code requirements will go into effect next year, with some regulations taking effect on Jan. 1, 2022.

Related Stories

| Jul 5, 2012

Continued tax breaks necessary for widespread adoption of net zero buildings

Tax breaks passed by the U.S. government to encourage construction of green buildings are set to expire in 2012 and 2013.

| Jun 28, 2012

Six buildings now recognized under Living Building Challenge

The Living Building Challenge (LBC), a green ratings system for design and construction that judges a building based on its actual performance, not just its projected performance at the design stage, has recognized six buildings to date.

| Jun 28, 2012

Label for building products will have ‘global warming number’

The director of the 2030 Challenge for Products says that the organization is aiming to place a label on building products that will list what’s in it, and how much embodied carbon each product represents.

| Jun 28, 2012

Top building material executive urges building resilience in sustainability standards

A meeting of 1,000 business executives at the recent Rio+20 environmental conference featured a passionate plea to include building resilience in efforts to boost sustainability.

| Jun 28, 2012

Following spate of skyscraper balcony glass panel breakages, Ontario adopts code change

Ontario's housing minister announced new building code rules to help prevent glass panels from breaking off high-rise balconies during hot weather.

| Jun 28, 2012

Factory worker deaths in Italy raise questions on building codes after earthquakes

Italian officials are questioning seismic building standards and inspection procedures in the aftermath of two damaging earthquakes.

| Jun 21, 2012

Brazilian engineering/construction firm Odebrecht sues Florida over ban on companies doing business in Cuba

Odebrecht Construction Inc., a Brazilian engineering and construction company, is suing the State of Florida over a new law that bans governments from hiring companies with business ties to Cuba.

| Jun 21, 2012

String of shattered glass balcony panels prompts call for code reform in Ontario

Since last summer, glass balconies have shattered at 13 different buildings in Toronto.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021