flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York City contractors adding 5% to 10% to construction costs due to trade war

Codes and Standards

New York City contractors adding 5% to 10% to construction costs due to trade war

Tariffs on steel, aluminum, and other materials swell budgets.


By Peter Fabris, Contributing Editor | March 21, 2019

Courtesy Pixabay

The U.S. trade war with China is having a significant impact on the cost of building materials, as reported in a new study by Turner & Townsend.

New York City building contractors are adding between 5% to 10% onto the total construction costs due to tariffs on the prices of steel, aluminum, and other materials, according to the construction consulting firm. A cost study of a completed 90-story building at the Hudson Yards development showed that if the project was being built now, the cost of the core and shell construction alone would have increased by up to $150 million due to tariffs that are driving price increases on materials.

The company calculates that the cost difference of constructing some supertall buildings in New York could be up to $100 million for buildings with an overall cost of $1-1.5 billion. 

Due to increased demand for domestic steel and recent reductions in production of steel made in China, the cost of domestic steel has risen an average of 22.4% over the last year. Turner & Townsend is warning owners that they should add up to a minimum of a 5% cost contingency on the total value of their core and shell steel framed buildings.

Owners should also consider early buyout packages and direct purchase of materials to lock in pricing on items such as steel and curtain wall as early as possible, the firm says.

Related Stories

Codes and Standards | Oct 24, 2019

ASHRAE design contest winners demonstrate building resilience

Model building, a city hall, could operate without utility service for two weeks.

Codes and Standards | Oct 22, 2019

Efficient material design, low-carbon concrete are critical to cutting GHG emissions in construction

Enhancing building utilization and reusing materials also aid carbon reduction.

Codes and Standards | Oct 18, 2019

St. Louis could save $61 million per year in energy costs by improved building performance

GHG gases can be reduced by at least 11% with upgrades to public buildings and large private buildings.

Codes and Standards | Oct 17, 2019

Slow payments cost GCs and subs $64 billion annually

Study finds 51-day average payment turnaround.

Codes and Standards | Oct 16, 2019

Cool pavement can make people hotter

Reflective coatings channel sunlight raising temperatures where pedestrians walk.

Codes and Standards | Oct 15, 2019

Utah adopts 2018 International Energy Conservation Code

Provisions include increased building envelope performance and reduced air infiltration.

Codes and Standards | Oct 14, 2019

States continue to beef up energy efficiency codes

ACEEE 50-state scorecard finds latest IECC code gaining adherents.

Codes and Standards | Oct 9, 2019

DOE releases Better Buildings Healthcare Financing Primer

Outlines financial strategies to implement energy-efficiency projects in healthcare.

Codes and Standards | Oct 8, 2019

Zero Carbon Buildings for All aims for ambitious emission reduction targets

Organization makes commitment to net zero carbon for all buildings by 2050.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021